A new report by the New York State Comptroller found that New York City construction site inspections and regulation enforcement need improvement.
The state watchdog found that nearly 90% of active New York City construction sites it visited had safety problems. It also said the city’s Department of Buildings doesn’t effectively prioritize which sites get inspected.
Officials from the Comptroller’s office visited 18 active construction sites last summer and reported that 16 of those sites had a total of 77 safety issues. The problems included not having a site safety manager, missing or incomplete site safety logs and daily inspection records, and no documentation of workers completing required site safety training or attending mandatory safety meetings.
In 60% of cases where hazardous conditions were present for more than 30 days, DOB did not issue a citation for failing to correct the problem, the report says. The DOB agreed with most recommendations made to improve practices as cited in the report, which included more timely action to fix hazardous conditions at job sites.
The city department’s chief also noted that conditions “may change on a daily, or even hourly basis; therefore, the types of conditions that the auditors noted may not be present at the time of DOB’s inspection.”
Related Stories
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.