A study released by the New York Building Congress shows that construction costs in Manhattan have risen 5% in each of the last two years, GlobeSt.com reports.
This number is higher than the average construction cost hikes nationwide, which were 2.5% in 2013 and 3% in 2014.
Hospital construction is the most expensive, at $800-$950 per sf. Five-star hotels follow at $700-$800 per sf, and university buildings at $600-$850 per sf.
City construction company representatives are concerned that costs could continue to rise despite the recent plunge in oil prices, because essential trades such as curtain wall and cast-in-place concrete have been reported to be running out of capacity.
President of the New York Building Congress Richard T. Anderson says that the annual 5% increase rate should be a cause for concern to the city, even though a considerable portion of the recent increase in costs is the product of forces beyond the city's control. He called for the industry and government to look for ways to reduce the cost of construction and eliminate regulations and red tape, according to GlobeSt.com.
Related Stories
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.