flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York City code update changes definition of a major building

Codes and Standards

New York City code update changes definition of a major building

Impacts how construction projects are permitted with major implications for contractors


By Peter Fabris, Contributing Editor | July 15, 2024
Image by Melissa Mahon from Pixabay

Image by Melissa Mahon from Pixabay

Changes affecting how construction projects in New York City are permitted will have significant impacts for contractors.

On Dec. 11, the definition of a major building in the city’s code will change from 10 stories to seven, or 75 feet. The change will affect thousands more projects.

It will require a site safety coordinator and an approved site safety plan for any major new build, full demolition, or interior demolition with mechanical equipment that is seven stories or higher. Contractors working on these major projects should hire professionals to assist them with navigating through the entire application, permit, certificate of occupancy, approval, and sign-off processes, advises a former New York Department of Buildings assistant commissioner. Contractors who have previously built only low-rise buildings should also hire a safety consultant to provide full-time safety professionals and obtain approvals for site safety plans and tenant protection plans, he says.

The code change includes a provision for construction superintendents to only be designated on three permits at one time. In January 2026, this number will be reduced to one permit. As a result, contractors should send their staff to obtain superintendent licenses and Supervisory SST training cards.

Related Stories

Codes and Standards | Mar 12, 2020

Design guide for sloped glazing and skylights updated for first time in 30 years

Helps with choosing proper glass for non-residential applications.

Codes and Standards | Mar 11, 2020

Two tree species native to the Northeast found suitable for CLT

Eastern white pine and eastern hemlock pass strength testing.

Codes and Standards | Mar 10, 2020

Prescient receives ICC certification for seismic resilience system

Technology suitable for buildings up to 12 stories in earthquake-prone areas.

Codes and Standards | Mar 6, 2020

Design firms creating plans to re-imagine D.C.’s tidal basin

Area including National Mall is facing increased flood risk.

Codes and Standards | Feb 28, 2020

Bay Area communities struggle with what to do about rising sea level

Policies include sea walls, levies, and relocation.

Codes and Standards | Feb 27, 2020

Cell phones present a safety hazard at job sites

Use of ear buds, headphones banned by some contractors.

Codes and Standards | Feb 26, 2020

American Concrete Institute releases 2020 codes, specifications, and practices

ACI Collection features guidance on structural concrete construction and rehabilitation.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021