flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York City chooses 20 firms for architectural design services on future public building projects

Codes and Standards

New York City chooses 20 firms for architectural design services on future public building projects

Half of those chosen are minority- and women-owned business enterprises.


By Peter Fabris, Contributing Editor | April 5, 2022
NY public adventures
Courtesy Pixabay.

The New York City Department of Design and Construction (DDC) has contracted with 20 firms to provide architectural design services for the city’s future public buildings projects under the latest round of DDC’s Project Excellence Program.
 
Ten of the firms are certified minority- and women-owned business enterprises (M/WBEs). This has allowed the agency to meet the city’s goals for contract awards to M/WBEs and increased the agency’s ability to create culturally competent designs, DDC says.
 
“The firms selected for Project Excellence went through a rigorous review process to ensure they can deliver inspirational and functional designs using sustainable and durable materials that can be built on time and on budget,” said DDC Commissioner Thomas Foley. “We are very pleased that half of the firms who will design the city’s public buildings are certified M/WBEs. DDC builds in every part of the city, and we have always sought firms that can create culturally sensitive projects that best serve the people who use them.”
 
Firms chosen include:
 
SMALL (5 – 20 professional staff)
 
•          Verona Carpenter Architects (WBE)
•          nARCHITECTS (M/WBE)
•          Shakespeare Gordon Vlado Architects (WBE)
•          Ricardo Zurita Architecture & Planning (MBE)
•          Murphy Burnham & Buttrick Architects (WBE)
 
MEDIUM (21 – 50 professional staff)
 
•          Selldorf Architects (WBE)
•          R2Architects (Ronnette Riley Architect/Ross Barney Architects JV) (WBE)
•          ikon.5 architects
•          Leroy Street Studio
•          BKSK Architects
•          ROGERS PARTNERS Architects+Urban Designers
•          Allied Works Architecture
•          TOD WILLIAMS BILLIE TSIEN Architects + Partners (M/WBE)
•          H3
•          PBDW Architects
 
LARGE (More than 50 professional staff)
 
•          Studio Gang (WBE)
•          SHoP Architects
•          Marvel (MBE)
•          Snøhetta
•          Grimshaw

Related Stories

| Feb 23, 2012

Federal agencies fixed on leasing LEED-certified space

The federal government is especially focused on renting LEED-certified spaces.

| Feb 23, 2012

Regulators investigating construction accident at World Trade Center

The New York Port Authority and the city’s fire and building departments are investigating an accident at the World Trade Center construction site in lower Manhattan after a crane dropped steel beams that fell about 40 stories onto the truck that delivered them.

| Feb 23, 2012

New Virginia statewide building code goes into effect March 1

After March 1, all building plans in Virginia must adhere to the 2009 code that was adopted a year ago.

| Feb 23, 2012

Privatizing flood insurance could lead to new code requirements

One thing that could pave the way toward private flood insurance would be NFIP reforms, like requiring new construction in flood-prone areas to be elevated.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 20, 2012

Comment period for update to USGBC's LEED Green Building Program now open

This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021