The New York City Department of Design and Construction (DDC) has contracted with 20 firms to provide architectural design services for the city’s future public buildings projects under the latest round of DDC’s Project Excellence Program.
Ten of the firms are certified minority- and women-owned business enterprises (M/WBEs). This has allowed the agency to meet the city’s goals for contract awards to M/WBEs and increased the agency’s ability to create culturally competent designs, DDC says.
“The firms selected for Project Excellence went through a rigorous review process to ensure they can deliver inspirational and functional designs using sustainable and durable materials that can be built on time and on budget,” said DDC Commissioner Thomas Foley. “We are very pleased that half of the firms who will design the city’s public buildings are certified M/WBEs. DDC builds in every part of the city, and we have always sought firms that can create culturally sensitive projects that best serve the people who use them.”
Firms chosen include:
SMALL (5 – 20 professional staff)
• Verona Carpenter Architects (WBE)
• nARCHITECTS (M/WBE)
• Shakespeare Gordon Vlado Architects (WBE)
• Ricardo Zurita Architecture & Planning (MBE)
• Murphy Burnham & Buttrick Architects (WBE)
MEDIUM (21 – 50 professional staff)
• Selldorf Architects (WBE)
• R2Architects (Ronnette Riley Architect/Ross Barney Architects JV) (WBE)
• ikon.5 architects
• Leroy Street Studio
• BKSK Architects
• ROGERS PARTNERS Architects+Urban Designers
• Allied Works Architecture
• TOD WILLIAMS BILLIE TSIEN Architects + Partners (M/WBE)
• H3
• PBDW Architects
LARGE (More than 50 professional staff)
• Studio Gang (WBE)
• SHoP Architects
• Marvel (MBE)
• Snøhetta
• Grimshaw
Related Stories
| Jul 12, 2012
Federal budget chief to explain impact of pending defense cuts before Congress
Office of Management and Budget Director Jeffrey Zients is scheduled to testify before the House Armed Services Committee Aug. 1 to explain the possible effects of $500 billion in defense cuts on U.S. companies, including those in the design and construction industry.
| Jul 12, 2012
Pennsylvania legislature moves to prevent undocumented workers on public construction projects
Legislation to prevent undocumented workers from being hired by construction companies working on state-funded projects passed the Pennsylvania Legislature.
| Jul 12, 2012
New York’s One Bryant Park Bank of America tower is first new high-rise to achieve LEED Platinum
The new One Bryant Park Bank of America tower in midtown Manhattan is the first new commercial high-rise to achieve LEED Platinum certification.
| Jul 12, 2012
OSHA launches campaign to prevent heat illness
The Occupational Safety and Health Administration has launched its 2012 Heat Illness Prevention Campaign to educate employees and their employers about the hazards of working outdoors in heat, and how to prevent heat-related illnesses.
| Jul 12, 2012
Contractors have increasing concerns over new federal hiring quotas
A proposed rule by the U.S. Department of Labor's Office of Federal Contract Compliance Programs to increase disabled- and veteran-worker hiring quotas for federal contractors continues to raise deep concerns among contractors.
| Jul 5, 2012
Veterans Administration threatens to pull contract on new Orlando medical center
The Veterans Administration asked contractor Brasfield & Gorrie to get more workers on the job and figure out a way to get the job done faster, or the VA would pull the contract on the much-delayed Orlando VA Medical Center.
| Jul 5, 2012
Cost to contractors for new federal hiring quotas much higher than estimated, AGC says
Administration officials significantly underestimated the cost to construction employers of proposed new hiring quotas for federal contractors, according to analysis by the Associated General Contractors of America.
| Jul 5, 2012
Roof membrane could have prevented roof parking deck collapse, specialist says
The collapse of a section of a roof parking deck at the Algo Centre Mall in Elliot Lake in Ontario, Canada could have been prevented if the structure had a membrane, according to a concrete expert and specialist in structure analysis at McMaster University.
| Jul 5, 2012
New Joplin, Mo. hospital being built to withstand tornado that destroyed predecessor
After the May 22, 2011, EF-5 tornado destroyed St. John’s Regional Medical Center in Joplin, Mo., architects and engineers analyzed how the nine-story structure reacted to the storm.