flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New windows and doors revitalize older buildings

New windows and doors revitalize older buildings

With their improved aesthetics, energy efficiency, and durability, replacement windows and doors can add significant value to a renovation project.


By By Sue Bady, Contributing Editor | March 30, 2012
For the renovation of Mitchell Hall at the University of New Mexico (designed by
For the renovation of Mitchell Hall at the University of New Mexico (designed by Pueblo Revival style advocate John Gaw Meem), t
This article first appeared in the April 2012 issue of BD+C.

When selecting replacement windows and doors for retrofits, Building Teams must consider aesthetics, cost, schedule, view, energy performance, accessibility, and durability. Then there are environmental and security considerations, such as vandal resistance, blast-hazard mitigation, and hurricane-impact protection. Fortunately, new technologies are making it easier to meet those requirements and upgrade the appearance and energy efficiency of a building, while keeping the project on budget.

Compared to the products available 15 years ago, new windows and doors offer greatly improved thermal performance, says John Bendt, sales/marketing vice president with Wausau Window and Wall Systems (www.wausauwindow.com). “That’s because better thermal separators, such as glass-reinforced nylon, provide superior insulation through increased aluminum separation and air space in the frames,” says Bendt.

Fabricated glass continues to improve in insulating value and controlling solar heat gain while letting an appropriate amount of natural light into the building. Triple-insulating glass is also being considered for more projects. “The biggest trend today is toward energy-efficient technologies, including aluminum-clad wood, fiberglass and vinyl frames, and high-performance, low-e glass,” says Terry Zeimetz, commercial marketing manager for Pella Corp. (www.pella.com).

“Aluminum cladding has come a long way in its ability to emulate wood profiles,” notes Jeff Hoffman, an architectural sales representative for Marvin Windows and Doors (http://commercial.marvin.com)

Older windows can be swapped out for new ones that offer similar sightlines and historical look. For example, aluminum-framed, projected windows can be made to look like old steel windows or double-hung windows but are easier to operate, says Bendt. Aluminum cladding is frequently used in historically influenced replacement windows because it’s durable and easy to customize. Factory-applied anodized and baked-on fluoropolymer paint finishes can be formulated to match existing color schemes or reproduce a building’s original colors. Such finishes are also eco-friendly.

Commercial doors can be specified with components and technologies to address constantly increasing thermal performance requirements. “Many types of high-performance glass, including those that withstand blasts and hurricane impact, can be incorporated without altering the overall look of a door,” says Mary Olivier, marketing manager for Tubelite Inc. (www.tubeliteinc.com), a manufacturer of architectural aluminum window, entrance storefront, and curtain wall systems.

Durability is a key factor in selecting a door/hardware combination and the size of the stiles (the vertical members of the door frame). But the most significant task in replacement projects, particularly for historic buildings, is to match the work of historic artisans using modern materials on a limited budget, Olivier says.

Deciding whether or not to use the existing window and door framing in a retrofit depends on such factors as the presence of wood rot and hazardous materials, the structural integrity of the existing frame, and the anchorage scheme of the replacement system, says Ken Brenden, CDT, of the American Architectural Manufacturers Association (www.aamanet.org), Schaumburg, Ill.

Bendt points out that older window frames don’t offer modern-day thermal technology and performance, so it’s worthwhile to evaluate new frames for their potential energy savings and reduced maintenance. Ultimately, the decision to keep or tear out existing framing should be based on energy modeling and budgeting information, he says.

Let’s take a look at a few instructive window/door retrofits.

[pagebreak]

UNIVERSITY RESIDENCE HALL UPGRADE: SAVE ENERGY, IMPROVE AESTHETICS

Eastern Michigan University, Ypsilanti, Mich., completed a $3.1 window renovation last year on its First-Year Center, a freshman residential hall that dates back to the 1960s. More than 675 operable, high-performance windows were installed.

Energy conservation and improved aesthetics were the primary goals, says architect Sandra Laux, AIA, of Detroit-based Hamilton Anderson Associates (www.hamilton-anderson.com). To replace the single-pane glazed windows with insulated units, Laux selected Wausau low-profile windows. Their aluminum frames have a copper anodized finish to contrast with the blond brick exterior. The low-maintenance, durable finish is expected to maintain its color over time without forming a patina.

The renovation also included replacement of the exterior doors and curtain wall system. “The stair towers had single-glazed curtain wall from the 1960s, which was failing,” says Hamilton Anderson’s Michael Decoster.

Decoster specified EFCO curtain wall and storefront framing systems for the stair towers and entry canopy. The existing concrete canopy rested on small steel columns and was “a really heavy mass” hanging over the entry. “We took that all off the structure and reclad the canopy in curtain wall framing, so on each side of the entry are two-foot-tall pieces of glass that are structurally glazed,” he says. The frosted glass is backlit at night.

OREGON STATE HOSPITAL: RESPECT FOR HISTORY

In 2008, the Oregon State Hospital (OSH) campus, in Salem, was granted national historic landmark status. A complete structural renovation wasn’t an option, but J Building, an 1883-vintage four-story structure designed in the Kirkbride style of psychiatric facilities—and made famous as the setting of the film “One Flew Over the Cuckoo’s Nest”—was restored and refurbished.

To bring the building up to 21st-century standards and seismic requirements, workers removed asbestos and lead paint, added steel rebar, layers of sprayed concrete, and new wood beams, and restored the original cupola.

But the grandest undertaking was the replacement of more than 500 windows on the street side of the building. “It was important to preserve as many historic features as possible,” says Patricia Feeny, communications manager for the OSH Replacement Project. “At the same time, we had to meet state-mandated energy and safety requirements.”

Wausau fabricated windows with sash muntins to match the originals in material and design. The psychiatric-grade windows were drop-tested for interior human impacts of up to 2,000 foot-pounds of energy. The aluminum frames have a resin-based coating that resists humidity, color change, chalking, gloss loss, and chemicals.

5 TIPS for a successful door and window retrofit

1. Analyze products on a level playing field using American Architectural Manufacturers Association and National Fenestration Rating Council (www.nfrc.org) standards and test sites. As you’re calculating ROI, be sure to factor in the savings that may come from being able to downsize the HVAC system, cut repair and maintenance costs, and trim energy costs due to better insulating value and more natural light.

2. Work with the manufacturer’s local architectural representative in the early stages of the project. Trained reps can help with site inspection, drawings, field measurements and testing, energy modeling, mockups, budgeting, detail support, and specification support.

3. Take advantage of AAMA publications on door and window selection criteria, design considerations, window and exterior door types, performance requirements and testing, and accessory items and special features: http://www.aamanet.org/general/1/45/publication-store.

4. Select an installer who will ensure a safe, hassle-free installation while minimizing disruptions to building occupants.  Your manufacturer can assist you in finding the right installer.

5. Use moderate door heights and widths, especially when using insulated or specialty glass. Large entrances also have increased size and weight, which places additional strain on hinging hardware and can shorten the door’s longevity.

MITCHELL HALL AT UNM: HOMAGE TO THE PAST

Mitchell Hall, one of the oldest classroom buildings at the University of New Mexico, was built in 1954. While not a registered historic landmark, the building is noteworthy for its design by John Gaw Meem IV (1894-1983), one of the Southwest’s most influential architects.

In tackling the renovation, Albuquerque-based Hartman + Majewski Design Group (designgroupnm.com) sought to preserve the building’s historic integrity while improving its environmental sustainability. The original single-pane, steel-framed windows had narrow sightlines and were stacked vertically with one-inch widths between glazings.

“Part of the goal was to maintain the exterior feel of the project so that the university could, in the future, pursue putting [the building] on the historic registry,” says principal architect Jeff Zellner, AIA, NCARB, LEED AP BD+C.

Hartman + Majewski analyzed the existing window systems and performed energy modeling as part of the LEED certification process. “We looked at improvements that would give us the biggest bang for the buck,” says Zellner.

The team considered a number of options, including true historic steel windows, storefront framing, and aluminum, but ultimately chose Pella fiberglass windows. “We were not familiar with fiberglass windows in commercial applications, but Pella did a pretty good sell on the performance characteristics as well as maintenance,” he says.

With the combined benefit of the new windows, a more efficient mechanical system, and enhanced lighting controls, Mitchell Hall is expected to earn LEED Silver.

THE ST. LOUIS ZOO: REPURPOSING THE ELEPHANT HOUSE

Peabody Hall, the oldest building at the St. Louis Zoo, was completed in 1917. The Renaissance Revival structure, designed by architect George Barnett, served for eight decades as the Elephant House. In 2009, Peabody Hall was renovated to house temporary exhibits in celebration of the zoo’s 100th anniversary. The project was a joint venture of two St. Louis-based design firms, Ottolino Winters Huebner (www.owh-inc.com) and the JCO LLC (www.thejco.com).

According to OWH, the original Elephant House’s masonry, stone, and terra cotta exterior had held up quite nicely over 95-plus years, but the windows and doors were well past their usable life—especially the ornate quatrefoil window in the attic. Finding durable, easy-to-use replacement products that allowed the necessary customization to replicate the form and appearance of the originals became the challenge.

Marvin Windows and Doors fabricated five large transoms, two sets of stationary awning windows, and seven commercial doors (three operating, four fixed) for the renovation. All windows and doors were glazed with black spandrel insulating glass that emulates the look of field-painted glass. To replicate the quatrefoil window, Marvin used five pieces of glass, with true divided lites in the rectangular center section and simulated divided lites surrounding the rectangle. +

Related Stories

| Sep 6, 2013

U40 Summit featured speaker: Arthur Gensler on how to build a world-class AEC practice

Gensler, founder of the world’s largest architecture firm, will talk about the role of the architect in society, the impact of great design, and the practicalities of starting and running a practice, and will offer advice for today’s young design and construction professionals.

| Sep 4, 2013

Augmented reality: 12 applications for design and construction professionals

Building Design+Construction reached out to AEC professionals who have studied and applied augmented reality and asked them to pinpoint applications that are ripe for the technology. Here’s what they had to offer.

| Sep 4, 2013

Augmented reality goes mainstream: 12 applications for design and construction firms

Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site. 

| Sep 4, 2013

K-12 school design that pays off for students

More and more educators are being influenced by the Reggio Emilia approach to pedagogy, with its mantra of “environment as the third teacher”—an approach that gives Building Teams a responsibility to pay even closer attention to the special needs of today’s schools.

| Sep 4, 2013

Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show

Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program. 

| Sep 4, 2013

Last chance to pre-register for BUILDINGChicago/Greening the Heartland Conference at 20% savings

Attendees of the BUILDINGChicago/Greening the Heartland Expo and Conference can still save 20% off the at-site registration fee by registering online in these final days before the event opens on September 9 and concludes on September 11.

| Sep 3, 2013

'School in a box' project will place school in San Diego public library

Thinking outside the box, LPA Inc. is designing a school inside a box. With an emphasis on three E’s—Engage, Educate, and Empower—e3 Civic High is now being constructed on the sixth and seventh floors of a public library in downtown San Diego. Library patrons will be able to see into the school via glass elevators, but will not have physical access to the school.

| Sep 3, 2013

Delinquency rate for commercial real estate loans at lowest level in three years

The delinquency rate for US commercial real estate loans in CMBS dropped for the third straight month to 8.38%. This represents a 10-basis-point drop since July's reading and a 175-basis-point improvement from a year ago. 

| Sep 3, 2013

EDGE studio, GBBN announce merger

GBBN Architects and EDGE studio of Pittsburgh, Pennsylvania are very pleased to announce the merger of their firms under GBBN Architects effective September 1, 2013.

| Sep 3, 2013

Jon Pettit (1952-2013) - DLR Group Managing Principal

Jonathan (Jon) E. Pettit, AIA, died August 19, 2013 in Seattle following treatment for cancer. He was 61. Pettit was a DLR Group managing principal and practiced for his entire professional career with DLR Group. 

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021