flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New White Paper on Metal Panel Fire Safety Released

Codes and Standards

New White Paper on Metal Panel Fire Safety Released

Has detailed information for insulation, fire safety requirements in U.S., other countries.


By Peter Fabris, Contirbuting Editor | September 5, 2018

The Metal Construction Association (MCA) has published a new white paper, “Fire Safety of Insulated Metal Wall Panels.”

The document contains detailed information on the efficacy of insulated metal panels (IMPs) for insulation and fire safety requirements in the U.S. and other countries. IMPs are lightweight composite exterior wall and roof panels with two layers of coated thin sheet metal (typically steel or aluminum) wrapped around a rigid foam core to form a stiff composite.

They are tested for fire, structural, thermal transmittance/resistance, foam core properties, water leakage, and air pressure differential. “In some cases, each component of a product can get good fire test results while the entire assembly burns vigorously, and vice versa,” according to a MCA news release. “Therefore, U.S. codes typically require composite assemblies to be fire tested both as a complete assembly and as separate components, particularly foam plastic insulation materials.”

"It's a misconception that non-combustible materials are always preferable to foam plastic materials in exterior claddings,” said Marcelo Hirschler of GBH International, a company specializing in fire test instruments and consulting services, in the release. “IMPs can be used safely in exterior claddings and should continue to be a significant part of building construction.”

Related Stories

Codes and Standards | Aug 11, 2021

Decentralized approach to codes means emissions reduction responsibility falls on local officials

Efficiency advocates focusing more on local code amendments.

Digital Twin | Aug 9, 2021

Digital Twin Maturity white paper offers guidance on digital twin adoption

Provides lifecycle map and an approach for incorporating digital twins.

Codes and Standards | Aug 5, 2021

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.

Codes and Standards | Aug 4, 2021

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.

Codes and Standards | Aug 3, 2021

Dept. of Energy releases initial version of the Spawn of EnergyPlus software

Targets new use cases in advanced controls, district systems, and grid integration.

Codes and Standards | Aug 2, 2021

Several U.S. cities among most expensive places to build in the world

San Francisco, New York, and Boston head the domestic list.

Codes and Standards | Jul 28, 2021

American Concrete Institute creates new director of innovative concrete technology post

Aim is to attract emerging technologies for development.

Codes and Standards | Jul 28, 2021

Higher ed faces infrastructure backlog of $112.3 billion

Study recommends integrated strategic planning for best results.

Codes and Standards | Jul 27, 2021

Add a wobbly moon to flooding risk factors

Earth satellite’s orbit variations will lead to sunny-day flooding in the mid-2030s.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021