flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ways to work with wood

New ways to work with wood

New products like cross-laminated timber are spurring interest in wood as a structural material.


By By Susan Bady, Contributing Editor | February 1, 2012
Wood columns made of parallel strand lumber support the steel roof and glass curtain wall of Arena Stage in Washington, D.C. The
This article first appeared in the February 2012 issue of BD+C.

Although wood is commonly used as a finish material in nonresidential buildings, more and more Building Teams are specifying wood as a structural material to accompany steel or concrete—or sometimes to be used entirely on its own. Recent studies show that wood offers such benefits as speed of construction, cost effectiveness, durability, and sustainability (see box, page 53). Structural wood products such as cross-laminated timber (CLT) and parallel strand lumber (PSL) are attracting the attention of architects, structural engineers, and contractors.

Research by the National Science Foundation and other partners on the performance of wood buildings during seismic events—the so-called NEESWood Capstone tests—is yielding promising results. For example, Japanese researchers built a seven-story wood-frame residential structure on a shake table and subjected it to Kobe-level earthquake conditions—6.9 on the Richter scale (see http://www.apawood.org/level_b.cfm?content=srv_newsinfo_34). “There was virtually no damage to the building,” says Dwight Yochim, national director of WoodWorks, an alliance of North American wood associations, headquartered in Vancouver, B.C.

Yochim says that one of the concerns with building with concrete or steel is the temptation to overbuild to compensate for the mass of the material itself. “Wood has many redundant connections and it’s light,” he says, “so when an earthquake hits, it doesn’t have the same impact on the building” as it would with a steel or concrete structure.

Yochim says some glulam manufacturers are adding steel straps to their beams to help carry the load over long spans. The Richmond Olympic Oval, built for the 2010 Winter Olympics in Vancouver, B.C., has a wood roof with a clear span of more than 300 feet. Part of the roof is constructed of double Douglas-fir glulam beams reinforced with steel straps.

“Wood is a viable building product and a good alternative to conventional construction,” says Blakely C. Dunn, AIA, NCARB, principal of CADM Architecture, El Dorado, Ark. “It’s easy to erect, and it’s easy to correct something that’s incorrect.” He notes that wood usually has a shorter lead time for delivery compared to other structural materials: “You don’t have to wait weeks for it to show up at the job site.”

Applications for structural wood expand

  • Architects and engineers are substituting wood framing for steel and concrete as a cost-saving measure.
  • Manufacturers are adding steel straps to glulam beams to help carry loads over long spans.
  • Cross-laminated timber is making its debut in the U.S. as an innovative framing material for buildings up to 10 stories in height.
  • Heavy-timber construction showcases the versatility, strength, and beauty of wood and can help keep projects on budget.

CROSS-LAMINATED TIMBER CROSSES THE POND
Cross-laminated timber has been widely used in Europe since the 1980s but is not well known in North America. CLT panels are manufactured by stacking multiple layers of wood, each about 20 to 38 millimeters in thickness, at right angles and gluing them together in a press. Typical widths are 0.6, 1.2, and 2.95 meters (up to 4 meters), in lengths up to 24 meters.

The cross-lamination process minimizes swelling and shrinkage and increases resistance. CLT panels are used for floor, wall, and roof systems. Pre-assembled wall sections can be lifted into place with cranes and attached to each other with screws or steel brackets.

“CLT competes head-to-head with concrete buildings up to six stories,” says Yochim. So far, the tallest CLT structure built in Europe is nine stories. Researchers in Austria are testing something called the life cycle tower, a combination of glulam beams, CLT, and concrete slabs that could go much higher. “They’re all prefabricated assemblies,” says Yochim. “Once you’ve got your foundation down, the rest of the building just bolts together.”

The first nonresidential CLT building to be constructed in the U.S., a 78-foot church bell tower, was completed in December 2010 in Gastonia, N.C. The tower has a 12x12-foot base and wood panels of varying lengths, which provide the strength and stability of concrete but are much lighter, says Michael DeVere, principal of MDS10 Architects, Asheville, N.C. The foundation is three feet deep.

To better analyze the stresses inflicted by wind and seismic loading and swinging bells, Medlock & Associates Engineering, Asheville, N.C., modeled the tower using RISA-3D design software. This enabled the engineers to keep the project within its $450,000 budget. For ease of assembly, they used a panelized system and kept connection variations to a minimum.

The panels were prefabricated in Austria, reducing the amount of on-site labor and virtually eliminating job-site waste. Tim Richards, vice president of general contractor M-Y Construction of Tryon, N.C., says a comparable steel structure would have taken three to four weeks to complete. With CLT, it took five-and-a-half days.

DeVere points out that CLT is also a green material, accounting for significantly less greenhouse gas emissions than concrete or steel. He also likes its creative nature. “It can free you from many of the constrictions of conventional construction,” he says. “Depending on the design, you can eliminate lintels and headers as well as columns and deep horizontal framing members.” Exterior wall panels distribute the bearing load evenly across the entire length, so most point loads can be dispersed, avoiding piers and pad footings and reducing the amount of concrete in the foundation.

“Some have described CLT as ‘Legos on steroids,’” says DeVere. “We see it as a game changer for the construction industry.” He and his business partner, Crawford Murphy, hope to open a CLT manufacturing facility in the U.S.

HEAVY TIMBER PLAYS LEAD ROLE IN THEATER
In British Columbia, the use of heavy timber in nonresidential projects is commonplace. But the concept raised eyebrows when first proposed for Arena Stage at the Mead Center for American Theater, in Washington, D.C.

“The local building authorities were skeptical at first about the use of timber for large institutional assembly buildings,” says Michael Heeney, MAIBC, FRAIC, LEED AP, principal of Bing Thom Architects, Vancouver, B.C. “They were concerned about flammability.” The firm and its fire engineers, LMDG, presented a fire report and char analysis which showed that the effects of a fire on the structure would be minimal. In fact, charring on the outside of the wood columns would actually protect the interior of the wood.

One of the project goals was to double the space of Arena Stage and the adjacent Kreeger Theater. There was no money in the budget for finishes, yet the structure had to be beautiful, so wood made perfect sense as both a structural and finish material. The architects wrapped the two theaters with an insulated glass wall, providing acoustic separation from nearby Reagan National Airport and highway traffic.

StructureCraft Builders, a specialty timber-frame design/builder based in Delta, B.C., crafted 18 giant columns out of parallel strand lumber (PSL) for the perimeter of the Arena Stage façade. The columns are unreinforced, solid engineered wood that use no internal steel support. Bing Thom Architects designed the kinds of connections used in a steel-frame building so that local steelworkers could install them.

“Wood is a very versatile material, but you need to spend time making the connections economical by encouraging as much repetition as possible,” says Heeney. “The PSL columns at Arena Stage connect to specially designed iron castings that would have been prohibitively expensive had we made only one.”

WOOD FRAMING SAVES $2.7 MILLION FOR SCHOOL
When the El Dorado (Ark.) School District needed a new high school for 1,600 students, the Building Team compared the cost of structural steel, precast concrete, and wood as a framing system.

Blake Dunn of CADM Architecture says the school’s construction budget was $134.78/sf. Had it been built with steel and masonry, the cost would have been $50/sf too high. Wood framing saved $2.7 million.

The original design intent—to use wood for exposed areas inside the building—was extended to concealed areas such as columns, beams, demising walls, office partitions, exterior walls, floors and roof systems. The structural components are predominately Southern yellow pine. Interior doors are maple; the paneling and trim are red oak. “The auditorium has large acoustical deflectors on the side walls that are made out of maple plywood,” he says. “They’re angled in such a way as to tune the space.” +

MORE ON THE BENEFITS OF STRUCTURAL WOOD
Science Supporting the Economic and Environmental Benefits of Using Wood and Wood Products in Green Building Construction,” Michael A. Ritter, Kenneth Skog, and Richard Bergman, USDA Forest Service.

Wood Products Used on the Construction of Low-Rise Nonresidential Buildings in the United States, 2008,” David B. McKeever, USDA Forest Service.

Maximizing Forest Contributions to Carbon Mitigation” (CORRIM Fact Sheet, March 2009).

Product and Process Environmental Improvement Analysis for Buildings (Carbon Life Cycle Assessment)” (CORRIM Fact Sheet, December 2009).

Related Stories

Multifamily Housing | Dec 20, 2022

Brooks + Scarpa-designed apartment provides affordable housing to young people aging out of support facilities

In Venice, Calif., the recently completed Rose Apartments provides affordable housing to young people who age out of youth facilities and often end up living on the street. Designed by Brooks + Scarpa, the four-story, 35-unit mixed-use apartment building will house transitional aged youths.

Coatings | Dec 20, 2022

The Pier Condominiums — What's old is new again!

When word was out that the condominium association was planning to carry out a refresh of the Pier Condominiums on Fort Norfolk, Hanbury jumped at the chance to remake what had become a tired, faded project.

Cladding and Facade Systems | Dec 20, 2022

Acoustic design considerations at the building envelope

Acentech's Ben Markham identifies the primary concerns with acoustic performance at the building envelope and offers proven solutions for mitigating acoustic issues.

Sponsored | Resiliency | Dec 14, 2022

Flood protection: What building owners need to know to protect their properties

This course from Walter P Moore examines numerous flood protection approaches and building owner needs before delving into the flood protection process. Determining the flood resilience of a property can provide a good understanding of risk associated costs.

Architects | Dec 14, 2022

Carol Ross Barney, FAIA, named 2023 AIA Gold Medal honoree 

The Board of Directors and the Strategic Council of the American Institute of Architects (AIA) are honoring Carol Ross Barney, FAIA, with the 2023 Gold Medal. The Gold Medal honors an individual whose significant body of work has had a lasting influence on the theory and practice of architecture.

Healthcare Facilities | Dec 14, 2022

In Flint, Mich., a new health center brings together children’s mental and physical health services

Families with children who experience behavioral health issues often have to travel to multiple care facilities to see multiple teams of specialists. In Flint, Mich., the new Center for Children’s Integrated Services at Genesee Health System (GHS), a public mental health provider, brings together all of the GHS children’s programs, including its behavioral health programs, under one roof. It provides families a single destination for their children’s mental healthcare.

Sponsored | Multifamily Housing | Dec 14, 2022

Urban housing revival: 3 creative multifamily housing renovations

This continuing education course from Bruner/Cott & Associates highlights three compelling projects that involve reimagining unlikely buildings for compelling multifamily housing developments.

Multifamily Housing | Dec 13, 2022

Top 106 multifamily housing kitchen and bath amenities – get the full report (FREE!)

Multifamily Design+Construction's inaugural “Kitchen+Bath Survey” of multifamily developers, architects, contractors, and others made it clear that supply chain problems are impacting multifamily housing projects.

Green | Dec 9, 2022

Reaching carbon neutrality in building portfolios ranks high for organizations

Reaching carbon neutrality with their building portfolios ranks high in importance among sustainability goals for organizations responding to a Honeywell/Reuters survey of senior executives at 187 large, multinational corporations. Nearly nine in 10 respondents (87%) say that achieving carbon neutrality in their building portfolio is either extremely (58%) or somewhat (29%) important in relation to their overall ESG goals. Only 4% of respondents called it unimportant.

Green | Dec 9, 2022

Newly formed Net Zero Built Environment Council aims to decarbonize the built world

Global management consulting firm McKinsey recently launched the Net Zero Built Environment Council, a cross-sector coalition of industry stakeholders aiming to decarbonize the built world. The council’s chief goal is to collaboratively create new pathways to cut greenhouse gas emissions from buildings.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021