flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ways to work with wood

New ways to work with wood

New products like cross-laminated timber are spurring interest in wood as a structural material.


By By Susan Bady, Contributing Editor | February 1, 2012
Wood columns made of parallel strand lumber support the steel roof and glass curtain wall of Arena Stage in Washington, D.C. The
This article first appeared in the February 2012 issue of BD+C.

Although wood is commonly used as a finish material in nonresidential buildings, more and more Building Teams are specifying wood as a structural material to accompany steel or concrete—or sometimes to be used entirely on its own. Recent studies show that wood offers such benefits as speed of construction, cost effectiveness, durability, and sustainability (see box, page 53). Structural wood products such as cross-laminated timber (CLT) and parallel strand lumber (PSL) are attracting the attention of architects, structural engineers, and contractors.

Research by the National Science Foundation and other partners on the performance of wood buildings during seismic events—the so-called NEESWood Capstone tests—is yielding promising results. For example, Japanese researchers built a seven-story wood-frame residential structure on a shake table and subjected it to Kobe-level earthquake conditions—6.9 on the Richter scale (see http://www.apawood.org/level_b.cfm?content=srv_newsinfo_34). “There was virtually no damage to the building,” says Dwight Yochim, national director of WoodWorks, an alliance of North American wood associations, headquartered in Vancouver, B.C.

Yochim says that one of the concerns with building with concrete or steel is the temptation to overbuild to compensate for the mass of the material itself. “Wood has many redundant connections and it’s light,” he says, “so when an earthquake hits, it doesn’t have the same impact on the building” as it would with a steel or concrete structure.

Yochim says some glulam manufacturers are adding steel straps to their beams to help carry the load over long spans. The Richmond Olympic Oval, built for the 2010 Winter Olympics in Vancouver, B.C., has a wood roof with a clear span of more than 300 feet. Part of the roof is constructed of double Douglas-fir glulam beams reinforced with steel straps.

“Wood is a viable building product and a good alternative to conventional construction,” says Blakely C. Dunn, AIA, NCARB, principal of CADM Architecture, El Dorado, Ark. “It’s easy to erect, and it’s easy to correct something that’s incorrect.” He notes that wood usually has a shorter lead time for delivery compared to other structural materials: “You don’t have to wait weeks for it to show up at the job site.”

Applications for structural wood expand

  • Architects and engineers are substituting wood framing for steel and concrete as a cost-saving measure.
  • Manufacturers are adding steel straps to glulam beams to help carry loads over long spans.
  • Cross-laminated timber is making its debut in the U.S. as an innovative framing material for buildings up to 10 stories in height.
  • Heavy-timber construction showcases the versatility, strength, and beauty of wood and can help keep projects on budget.

CROSS-LAMINATED TIMBER CROSSES THE POND
Cross-laminated timber has been widely used in Europe since the 1980s but is not well known in North America. CLT panels are manufactured by stacking multiple layers of wood, each about 20 to 38 millimeters in thickness, at right angles and gluing them together in a press. Typical widths are 0.6, 1.2, and 2.95 meters (up to 4 meters), in lengths up to 24 meters.

The cross-lamination process minimizes swelling and shrinkage and increases resistance. CLT panels are used for floor, wall, and roof systems. Pre-assembled wall sections can be lifted into place with cranes and attached to each other with screws or steel brackets.

“CLT competes head-to-head with concrete buildings up to six stories,” says Yochim. So far, the tallest CLT structure built in Europe is nine stories. Researchers in Austria are testing something called the life cycle tower, a combination of glulam beams, CLT, and concrete slabs that could go much higher. “They’re all prefabricated assemblies,” says Yochim. “Once you’ve got your foundation down, the rest of the building just bolts together.”

The first nonresidential CLT building to be constructed in the U.S., a 78-foot church bell tower, was completed in December 2010 in Gastonia, N.C. The tower has a 12x12-foot base and wood panels of varying lengths, which provide the strength and stability of concrete but are much lighter, says Michael DeVere, principal of MDS10 Architects, Asheville, N.C. The foundation is three feet deep.

To better analyze the stresses inflicted by wind and seismic loading and swinging bells, Medlock & Associates Engineering, Asheville, N.C., modeled the tower using RISA-3D design software. This enabled the engineers to keep the project within its $450,000 budget. For ease of assembly, they used a panelized system and kept connection variations to a minimum.

The panels were prefabricated in Austria, reducing the amount of on-site labor and virtually eliminating job-site waste. Tim Richards, vice president of general contractor M-Y Construction of Tryon, N.C., says a comparable steel structure would have taken three to four weeks to complete. With CLT, it took five-and-a-half days.

DeVere points out that CLT is also a green material, accounting for significantly less greenhouse gas emissions than concrete or steel. He also likes its creative nature. “It can free you from many of the constrictions of conventional construction,” he says. “Depending on the design, you can eliminate lintels and headers as well as columns and deep horizontal framing members.” Exterior wall panels distribute the bearing load evenly across the entire length, so most point loads can be dispersed, avoiding piers and pad footings and reducing the amount of concrete in the foundation.

“Some have described CLT as ‘Legos on steroids,’” says DeVere. “We see it as a game changer for the construction industry.” He and his business partner, Crawford Murphy, hope to open a CLT manufacturing facility in the U.S.

HEAVY TIMBER PLAYS LEAD ROLE IN THEATER
In British Columbia, the use of heavy timber in nonresidential projects is commonplace. But the concept raised eyebrows when first proposed for Arena Stage at the Mead Center for American Theater, in Washington, D.C.

“The local building authorities were skeptical at first about the use of timber for large institutional assembly buildings,” says Michael Heeney, MAIBC, FRAIC, LEED AP, principal of Bing Thom Architects, Vancouver, B.C. “They were concerned about flammability.” The firm and its fire engineers, LMDG, presented a fire report and char analysis which showed that the effects of a fire on the structure would be minimal. In fact, charring on the outside of the wood columns would actually protect the interior of the wood.

One of the project goals was to double the space of Arena Stage and the adjacent Kreeger Theater. There was no money in the budget for finishes, yet the structure had to be beautiful, so wood made perfect sense as both a structural and finish material. The architects wrapped the two theaters with an insulated glass wall, providing acoustic separation from nearby Reagan National Airport and highway traffic.

StructureCraft Builders, a specialty timber-frame design/builder based in Delta, B.C., crafted 18 giant columns out of parallel strand lumber (PSL) for the perimeter of the Arena Stage façade. The columns are unreinforced, solid engineered wood that use no internal steel support. Bing Thom Architects designed the kinds of connections used in a steel-frame building so that local steelworkers could install them.

“Wood is a very versatile material, but you need to spend time making the connections economical by encouraging as much repetition as possible,” says Heeney. “The PSL columns at Arena Stage connect to specially designed iron castings that would have been prohibitively expensive had we made only one.”

WOOD FRAMING SAVES $2.7 MILLION FOR SCHOOL
When the El Dorado (Ark.) School District needed a new high school for 1,600 students, the Building Team compared the cost of structural steel, precast concrete, and wood as a framing system.

Blake Dunn of CADM Architecture says the school’s construction budget was $134.78/sf. Had it been built with steel and masonry, the cost would have been $50/sf too high. Wood framing saved $2.7 million.

The original design intent—to use wood for exposed areas inside the building—was extended to concealed areas such as columns, beams, demising walls, office partitions, exterior walls, floors and roof systems. The structural components are predominately Southern yellow pine. Interior doors are maple; the paneling and trim are red oak. “The auditorium has large acoustical deflectors on the side walls that are made out of maple plywood,” he says. “They’re angled in such a way as to tune the space.” +

MORE ON THE BENEFITS OF STRUCTURAL WOOD
Science Supporting the Economic and Environmental Benefits of Using Wood and Wood Products in Green Building Construction,” Michael A. Ritter, Kenneth Skog, and Richard Bergman, USDA Forest Service.

Wood Products Used on the Construction of Low-Rise Nonresidential Buildings in the United States, 2008,” David B. McKeever, USDA Forest Service.

Maximizing Forest Contributions to Carbon Mitigation” (CORRIM Fact Sheet, March 2009).

Product and Process Environmental Improvement Analysis for Buildings (Carbon Life Cycle Assessment)” (CORRIM Fact Sheet, December 2009).

Related Stories

| Jan 28, 2014

16 awe-inspiring interior designs from around the world [slideshow]

The International Interior Design Association released the winners of its 4th Annual Global Excellence Awards. Here's a recap of the winning projects.

| Jan 28, 2014

Big Ten Conference opens swanky HQ and museum [slideshow]

The new mixed-use headquarters includes a museum, broadcast studios, conference facilities, office spaces, and, oh yeah, a Brazilian steakhouse.

| Jan 27, 2014

A climber's dream: Rock climbing hall planned near Iran's highest peak

Forget the rock climbing wall. A developer in Iran is building a rock climbing hall. That's right, an entire building dedicated to the sport, with more than 48,000 sf of program space. 

| Jan 24, 2014

First look: Foster + Partners' new home for Yale School of Management [slideshow]

Edward P. Evans Hall, the new home of the Yale School of Management, has opened for business. The 242,000-sf facility was designed by Foster + Partners, with Gruzen Samton as architect of record. 

| Jan 24, 2014

Reed Expansion Index predicts widespread economic improvement for the year

Reed's December Expansion Index stood at 1.48, indicating overall construction in the United States is expected to grow over the next 12 months.

| Jan 24, 2014

Urban Land Institute, Enterprise outline issues in rental housing shortage: Report

Bending the Cost Curve: Solutions to Expand the Supply of Affordable Rentals outlines factors that impede the development of affordable rental housing – causing the supply in many markets to fall far short of the demand.

| Jan 24, 2014

ZGF announces formal partnership with Vancouver's Cotter Architects

ZGF has announced the formal establishment of a Vancouver, British Columbia, presence in partnership with Cotter Architects.

| Jan 24, 2014

Structural concrete requirements under revision: ACI 318 standard

The American Concrete Institute (ACI), an organization whose mission is to develop and disseminate consensus-based knowledge on concrete and its uses, is finalizing a completely reorganized ACI 318-14: Building Code Requirements for Structural Concrete.

| Jan 23, 2014

SMPS Announces Call for Entries for 37th Annual Marketing Communications Awards Program

The Society for Marketing Professional Services (SMPS) is accepting entries for its 37th Annual Marketing Communications Awards (MCA) competition. The MCA program is the longest-standing, most prestigious awards program recognizing excellence in marketing communications by professional services firms in the design and building industry. The entry deadline is March 3, 2014. SMPS members and nonmembers are eligible to enter.

| Jan 23, 2014

Adrian Smith + Gordon Gill-designed Federation of Korean Industries tower opens in Seoul [slideshow]

The 50-story tower features a unique, angled building-integrated photovoltaic (BIPV) exterior designed to maximize the amount of energy collected.

boombox1
boombox2
native1

More In Category


Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021