A new Walgreens store that recently opened in California provides a regionally specific look, which was required by the land owner, Serrano Development, and local jurisdictional authorities.
The El Dorado Hills' Walgreens was designed in the Santa Barbara style, which is composed of a traditional arched entry and towers with medallion sand scroll element accents, vaulted clay-tile roofs, smooth-finish plaster walls with ceramic tile accent bands, fabric awnings, custom wrought iron detailing and on-site pergolas with custom columns and trellis to give a human scale to the site landscaping.
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design; however, it is in context with the design of the other retail buildings planned for The Shops. Walgreens was supportive of the unique design requirements.
The store was developed for Walgreens by BENCOR, LLC of Colorado Springs, CO. CSHQA provided local site support, in coordination with TSD Civil Engineers; design and construction documents and administration for the team which included BENCOR, Pete Navarro and Serrano Development. BD+C
Related Stories
| Dec 2, 2011
Goody Clancy awarded Ohio State residential project
The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.
| Dec 1, 2011
Nauset Construction breaks ground on Massachusetts health care center
The $20 million project is scheduled to be completed by December 2012.
| Dec 1, 2011
Ground broken on first LEED Platinum designed school house built by volunteers
Phoenix public school receives the generous gift of a state-of-the-art building for student and community use.
| Dec 1, 2011
VLK Architects’ office receives LEED certification
The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.
| Nov 29, 2011
First EPD awarded to exterior roof and wall products manufacturer
EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 29, 2011
Turner Construction establishes partnership with Clark Builders
Partnership advances growth in the Canadian marketplace.
| Nov 29, 2011
AIA launches stalled projects database
To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.