flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New VA care center showcases the agency’s P3 approach to financing healthcare facilities

Healthcare Facilities

New VA care center showcases the agency’s P3 approach to financing healthcare facilities

Clinic programming enhances patient privacy.


By John Caulfield, Senior Editor | August 13, 2020

The Department of Veterans Affairs' new care center, in Omaha, Neb., offers eight primary clinics. Images: Courtesy of Leo A Daly

The 160,000-sf, three-story VA Ambulatory Care Center opened in Omaha, Neb., on August 3. This is the first of five pilot projects authorized to be built under the Communities Helping Invest through Property and Improvements Needed for Veterans Act, otherwise known as CHIP IN, which became law in 2016 and allows the cash-strapped U.S. Department of Veterans Affairs to use private investments to fund construction and real estate purchases.

The Omaha facility’s $86 million price tag was defrayed by $30 million in private contributions funneled through the nonprofit Heritage Services, the project’s construction manager, which donated its services and the building to the VA. This funding mechanism created efficiencies that shortened construction time and aligned design specifications with those used in private healthcare projects.

Also see: Outpatient clinics bring the VA closer to injured veterans

The new center has the capacity to provide healthcare services to about 400 patients per day.

LEO A DALY provided the architectural, engineering, and interior design services on this project, for which McCarthy Building Companies was the GC. The Ambulatory Care Center has eight primary care clinics, including one for women vets (a first in VA’s healthcare network), and a care clinic that’s shared by orthopedics, cardiology, and other specialty medical practices.

A WALL DESIGNED TO RESEMBLE A WAVING FLAG

Alternating colors along the building's western facade symbolize the colored bars earned by miltary servicemen and women.

 

All clinics employ Patient Aligned Care Team (PACT) programming to enhance patient privacy and navigation. By centralizing clinical staff and resources, the PACT model also promotes collaboration. A new outpatient surgery center occupies the third floor, along with radiology. On the first level, a new connector building provides direct indoor access to the existing hospital and its services.

Sophisticated structural and architectural coordination created the folded glass form of the building’s “flag wall.” Against the western façade, alternating colors symbolize the “colored bars” earned by military servicemen and women for acts of gallantry and heroism. Both walls use transparent glazing to stream abundant daylighting into the interior spaces.

Also see: Veterans’ mental health needs are central to Seattle’s VA design

A sense of refuge, comfort, and reflection are reinforced by amenities that include an outdoor healing garden and commissioned artwork (some of it created by veteran-artists) installed in the facility’s public spaces.

The new Ambulatory Care Center replaces a crumbling hospital built in the 1940s and had long been on the VA’s list of replacement priorities.

Related Stories

Healthcare Facilities | Nov 30, 2018

As telehealth reshapes patient care, space and design needs become clearer

Guidelines emphasize maintaining human interaction.  

Healthcare Facilities | Nov 7, 2018

Designing environments for memory care residents

How can architecture decrease frustration, increase the feeling of self-worth, and increase the ability to re-connect?

Healthcare Facilities | Oct 30, 2018

Orthopedic Associates of Hartford unveils plans for 45,000-sf surgical center

MBH ARCHITECTURE is the architect for the project.

Healthcare Facilities | Oct 29, 2018

Outpatient clinics bring the VA closer to injured veterans

The Department of Veterans Affairs is making efforts to improve its construction management and align its design guidelines to industry standards.

Healthcare Facilities | Oct 22, 2018

WSP-HKS JV signs deal for U.S. Navy construction work

The contract is not exclusive to the two firms, but it lets NAVFAC assign certain projects to them.

Healthcare Facilities | Oct 12, 2018

N.Y. builder pushes to get military trauma centers up and running quicker

To date, seven NICoE Spirit satellite centers have been built on the grounds of Fort Belvoir in Virginia, Camp Lejeune and Fort Bragg in North Carolina, Fort Campbell in Kentucky, Fort Hood in Texas, Joint Base Lewis-McChord in Washington, and Camp Pendleton in California.

Healthcare Facilities | Sep 7, 2018

Medical office construction isn’t keeping pace with the aging of America

A new Transwestern report suggests a “rethinking” of healthcare delivery approaches that lean heavier on technology.

Engineers | Aug 22, 2018

An electrical engineer’s take on designing successful pharmaceutical lab space

Patrick Licklider, PE, CEM, GGP, LEED AP BD+C, an electrical engineer in Clark Nexsen’s Science + technology practice, shares his perspective on what it takes to successfully design laboratory and manufacturing environments for the fast-changing pharmaceutical and biotech industry.

Healthcare Facilities | Aug 3, 2018

Seismic deadlines approaching for healthcare companies

California hospitals can save money with a holistic approach to retrofit issues.

boombox1
boombox2
native1

More In Category



Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021