flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Toronto office is Thornton Tomasetti's first in Canada

Engineers

New Toronto office is Thornton Tomasetti's first in Canada

The global engineering firm already has a history of working with Canadian architects and developers.


By BD+C Staff | March 8, 2016
New Toronto office is Thornton Tomasetti's first in Canada

Construction of Edmonton's Rogers Place in the summer of 2015. Thornton Tomasetti is the building's structural engineer. Photo: WpgJets4Life/Wikimedia Commons.

The engineering firm Thornton Tomasetti announced this week that it is expanding into Canada with the opening of an office in Toronto.

Thornton Tomasetti already has a working relationship with the nation. The firm has worked with Canadian architects, designers, and consultants on more than 50 projects over the last 30 years. Current projects include structural design and façade optimization analysis for Edmonton’s Rogers Place, a new 1.4 million-sf arena for the NHL’s Edmonton Oilers, and structural design for the expansion of Toronto’s BMO Field.

“Expanding into Canada is a key strategic initiative of our five-year plan,” Thomas Z. Scarangello, P.E., Chairman and CEO of Thornton Tomasetti, said in a statement. “As we look to grow our business, Canada is a natural fit. We have considerable project experience there and an extensive client base. It is also a market in which our services are recognized and valued. We look forward to bringing the centers of excellence of our 10 practices to Canada.”

The Toronto office will be managed by Associate Principal Chris Minerva, who last ran the Toronto office of MMM Group. Thornton Tomasetti has 38 offices across the globe in places like Brazil, Vietnam, the United Kingdom, and China, and it has 22 offices and its New York headquarters in the United States.

Tags

Related Stories

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021