flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Office Buildings

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Approximately 400 employees will occupy the SkB Architects-designed space.


By David malone, Associate Editor | February 20, 2018

Photo: Magda Biernat

Tommy Bahama’s new 120,000-sf Seattle campus has a design focused on user experience and was inspired by the company’s ethos to “Make Life One Long Weekend.”

The open, casual setting has spaces that feature a natural material palette and rich textures such as woven fabric wall coverings and rough-honed stone. A “grand boardwalk” organizes the space and draws guests from the main lobby and reception to the showroom, mock store, and collaborative workspaces. Casual seating areas line the boardwalk and provide opportunities for informal gatherings.

 

Tommy Bahama headquartersPhoto: Magda Biernat.

 

Workspaces have been designed with flexibility in mind so users can tailor the environment based on departmental and team requirements. The reception area and amenities are located on an intermediate level of the HQ’s four floors to ensure employee interaction and social engagement.

The company decided to lease the floors for the headquarters space in the base of the office tower as opposed to the upper floors in order to create and reinforce physical and visual connections to the community. Breakout and workspaces were designed around large four-story light monitors with access to the market hall at the base of the building to encourage gathering.

 

Photo: Spencer Lowell.

 

Each floor has its own coffee bar and a 1,000-sf café on the main level opens out to a 1,500-sf roof deck. The office’s customized workstations feature sit-to-stand desks, ergonomic monitor arms, and task lighting.

The building team includes SkB Architects (interior architecture and interior design), MKA (structural), Lima (lighting), GCH (landscape), Stantec (acoustical), Commercial Office Interiors (furniture procurement), University Mechanical (mechanical-plumbing design-build), Veca (electrical design-build), Skanska (contractor).

 

Tommy Bahama roof gardenPhoto: Magda Biernat.

 

Tommy Bahama reception areaPhoto: Magda Biernat.

Related Stories

Retail Centers | May 18, 2015

ULI forecast sees clear skies for real estate over next three years

With asset availability declining in several sectors, rents and transactions should rise.

Office Buildings | May 18, 2015

New ASHRAE standard offers test method to determine heat gain of office equipment

The standard will aid engineers in configuring cooling systems in office buildings.

Office Buildings | May 17, 2015

Mountain View, Calif., denies development rights for Google campus master plan

Despite Google’s offer of new bike paths, wetlands restoration, and other perks, the city of Mountain View, Calif., denied the company the development rights to construct a grand new headquarters.

Sponsored | Coatings | May 14, 2015

Prismatic coatings accent the new Altara Center

This multi-use campus will contain a university, sports facilities, medical center, and world-class shopping

Industrial Facilities | May 11, 2015

SOM-designed Manufacturing and Design Innovation Institute opens in Chicago

The new space will be a place for academia, industries, and civic bodies to collaborate.

Mixed-Use | May 10, 2015

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.

High-rise Construction | May 6, 2015

Two new designs submitted for New York City Riverside Center

Both designs reference the cantilevers and other elements featured in architect Christian de Portzamparc’s original masterplan for the complex, which has now been scrapped.

High-rise Construction | May 6, 2015

Parks in the sky? Subterranean bike paths? Meet the livable city, designed in 3D

Today’s great cities must be resilient—and open—to many things, including the influx of humanity, writes Gensler co-CEO Andy Cohen. 

Building Owners | May 6, 2015

Hackathons and RFCs: Why one developer killed the RFP

In lieu of an RFP process, Skanska Commercial Development hosted a three-week "hackathon" to find an architect for its 2&U tower in Seattle.

Office Buildings | May 6, 2015

Is the office lobby the workplace of the future?

Perkins+Will's Tony Layne discusses three key trends driving the shift to workplaces that offer greater flexibility and choice for employees.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021