flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Office Buildings

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Approximately 400 employees will occupy the SkB Architects-designed space.


By David malone, Associate Editor | February 20, 2018

Photo: Magda Biernat

Tommy Bahama’s new 120,000-sf Seattle campus has a design focused on user experience and was inspired by the company’s ethos to “Make Life One Long Weekend.”

The open, casual setting has spaces that feature a natural material palette and rich textures such as woven fabric wall coverings and rough-honed stone. A “grand boardwalk” organizes the space and draws guests from the main lobby and reception to the showroom, mock store, and collaborative workspaces. Casual seating areas line the boardwalk and provide opportunities for informal gatherings.

 

Tommy Bahama headquartersPhoto: Magda Biernat.

 

Workspaces have been designed with flexibility in mind so users can tailor the environment based on departmental and team requirements. The reception area and amenities are located on an intermediate level of the HQ’s four floors to ensure employee interaction and social engagement.

The company decided to lease the floors for the headquarters space in the base of the office tower as opposed to the upper floors in order to create and reinforce physical and visual connections to the community. Breakout and workspaces were designed around large four-story light monitors with access to the market hall at the base of the building to encourage gathering.

 

Photo: Spencer Lowell.

 

Each floor has its own coffee bar and a 1,000-sf café on the main level opens out to a 1,500-sf roof deck. The office’s customized workstations feature sit-to-stand desks, ergonomic monitor arms, and task lighting.

The building team includes SkB Architects (interior architecture and interior design), MKA (structural), Lima (lighting), GCH (landscape), Stantec (acoustical), Commercial Office Interiors (furniture procurement), University Mechanical (mechanical-plumbing design-build), Veca (electrical design-build), Skanska (contractor).

 

Tommy Bahama roof gardenPhoto: Magda Biernat.

 

Tommy Bahama reception areaPhoto: Magda Biernat.

Related Stories

Office Buildings | Apr 5, 2021

Innovation One completes at University Research Park in Madison, Wis.

Valerio Dewalt Train designed the project.

Office Buildings | Mar 30, 2021

WELL Institute certifies a gigantic office complex with its highest health and safety rating

Poland’s Olivia Business Center one of the first to install ion air purification devices.

Office Buildings | Mar 26, 2021

Finding success for downtown office space after COVID-19

Using the right planning tools can spur new uses for Class B and C commercial real estate.

Office Buildings | Mar 24, 2021

JEA Headquarters tops out in Jacksonville

The building has recently topped out.

Energy Efficiency | Mar 23, 2021

ASHRAE’s new headquarters walks the talk about net-zero energy

The conversion of a 1970s’-era building demonstrates how older structures can be made more efficient and sustainable.

Office Buildings | Mar 16, 2021

Perkins&Will unveils design of its New York Studio

The studio supports hybrid work models with agile layouts and integrated broadcast technologies.

Laboratories | Mar 10, 2021

8 tips for converting office space to life sciences labs

Creating a successful life sciences facility within the shell of a former office building can be much like that old “square peg round hole” paradigm. Two experts offer important advice.

Office Buildings | Mar 4, 2021

1905 industrial building set to become Acciona’s new office in Madrid

Foster + Partners is designing the project.

Office Buildings | Mar 3, 2021

Turano Baking Company’s new HQ and test kitchen completes in Oak Park, Ill.

Wright Heerema Architects designed the project.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021