flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Office Buildings

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Approximately 400 employees will occupy the SkB Architects-designed space.


By David malone, Associate Editor | February 20, 2018

Photo: Magda Biernat

Tommy Bahama’s new 120,000-sf Seattle campus has a design focused on user experience and was inspired by the company’s ethos to “Make Life One Long Weekend.”

The open, casual setting has spaces that feature a natural material palette and rich textures such as woven fabric wall coverings and rough-honed stone. A “grand boardwalk” organizes the space and draws guests from the main lobby and reception to the showroom, mock store, and collaborative workspaces. Casual seating areas line the boardwalk and provide opportunities for informal gatherings.

 

Tommy Bahama headquartersPhoto: Magda Biernat.

 

Workspaces have been designed with flexibility in mind so users can tailor the environment based on departmental and team requirements. The reception area and amenities are located on an intermediate level of the HQ’s four floors to ensure employee interaction and social engagement.

The company decided to lease the floors for the headquarters space in the base of the office tower as opposed to the upper floors in order to create and reinforce physical and visual connections to the community. Breakout and workspaces were designed around large four-story light monitors with access to the market hall at the base of the building to encourage gathering.

 

Photo: Spencer Lowell.

 

Each floor has its own coffee bar and a 1,000-sf café on the main level opens out to a 1,500-sf roof deck. The office’s customized workstations feature sit-to-stand desks, ergonomic monitor arms, and task lighting.

The building team includes SkB Architects (interior architecture and interior design), MKA (structural), Lima (lighting), GCH (landscape), Stantec (acoustical), Commercial Office Interiors (furniture procurement), University Mechanical (mechanical-plumbing design-build), Veca (electrical design-build), Skanska (contractor).

 

Tommy Bahama roof gardenPhoto: Magda Biernat.

 

Tommy Bahama reception areaPhoto: Magda Biernat.

Related Stories

Green | Apr 18, 2023

USGBC and IWBI unveil streamlined certification pathway for LEED and WELL green building programs

The U.S. Green Building Council, Green Business Certification Inc., and the International WELL Building Institute released a streamlined process for projects pursuing certifications for the LEED green building rating system and the WELL Building Standard. The new protocol simplifies documentation for projects that are pursuing both certifications at the same time or that have already earned one certification and are looking to add the other. 

Office Buildings | Apr 13, 2023

L.A. headquarters for startup Califia Farms incorporates post-pandemic hybrid workplace design concepts

The new Los Angeles headquarters for fast-growing Califia Farms, a brand of dairy alternative products, was designed by SLAM with the post-Covid hybrid work environment in mind. Located in Maxwell Coffee House, a historic production facility built in 1924 that has become a vibrant mixed-use complex, the office features a café bordered by generous meeting rooms.

Market Data | Apr 11, 2023

Construction crane count reaches all-time high in Q1 2023

Toronto, Seattle, Los Angeles, and Denver top the list of U.S/Canadian cities with the greatest number of fixed cranes on construction sites, according to Rider Levett Bucknall's RLB Crane Index for North America for Q1 2023.

Contractors | Apr 10, 2023

What makes prefabrication work? Factors every construction project should consider

There are many factors requiring careful consideration when determining whether a project is a good fit for prefabrication. JE Dunn’s Brian Burkett breaks down the most important considerations. 

Mixed-Use | Apr 7, 2023

New Nashville mixed-use high-rise features curved, stepped massing and wellness focus

Construction recently started on 5 City Blvd, a new 15-story office and mixed-use building in Nashville, Tenn. Located on a uniquely shaped site, the 730,000-sf structure features curved, stepped massing and amenities with a focus on wellness.

Architects | Apr 6, 2023

New tool from Perkins&Will will make public health data more accessible to designers and architects

Called PRECEDE, the dashboard is an open-source tool developed by Perkins&Will that draws on federal data to identify and assess community health priorities within the U.S. by location. The firm was recently awarded a $30,000 ASID Foundation Grant to enhance the tool. 

Architects | Apr 6, 2023

Design for belonging: An introduction to inclusive design

The foundation of modern, formalized inclusive design can be traced back to the Americans with Disabilities Act (ADA) in 1990. The movement has developed beyond the simple rules outlined by ADA regulations resulting in features like mothers’ rooms, prayer rooms, and inclusive restrooms.

Sustainability | Apr 4, 2023

NIBS report: Decarbonizing the U.S. building sector will require massive, coordinated effort

Decarbonizing the building sector will require a massive, strategic, and coordinated effort by the public and private sectors, according to a report by the National Institute of Building Sciences (NIBS).

Legislation | Mar 24, 2023

New York lawmakers set sights on unsafe lithium-ion batteries used in electric bikes and scooters

Lawmakers in New York City and statewide have moved to quell the growing number of fires caused by lithium-ion batteries used in electric bikes and scooters.

Government Buildings | Mar 24, 2023

19 federal buildings named GSA Design Awards winners

After a six-year hiatus, the U.S. General Services Administration late last year resumed its esteemed GSA Design Awards program. In all, 19 federal building projects nationwide were honored with 2022 GSA Design Awards, eight with Honor Awards and 11 with Citations.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021