flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Office Buildings

New Tommy Bahama HQ looks to ‘Make Life One Long Weekend’ for its employees

Approximately 400 employees will occupy the SkB Architects-designed space.


By David malone, Associate Editor | February 20, 2018

Photo: Magda Biernat

Tommy Bahama’s new 120,000-sf Seattle campus has a design focused on user experience and was inspired by the company’s ethos to “Make Life One Long Weekend.”

The open, casual setting has spaces that feature a natural material palette and rich textures such as woven fabric wall coverings and rough-honed stone. A “grand boardwalk” organizes the space and draws guests from the main lobby and reception to the showroom, mock store, and collaborative workspaces. Casual seating areas line the boardwalk and provide opportunities for informal gatherings.

 

Tommy Bahama headquartersPhoto: Magda Biernat.

 

Workspaces have been designed with flexibility in mind so users can tailor the environment based on departmental and team requirements. The reception area and amenities are located on an intermediate level of the HQ’s four floors to ensure employee interaction and social engagement.

The company decided to lease the floors for the headquarters space in the base of the office tower as opposed to the upper floors in order to create and reinforce physical and visual connections to the community. Breakout and workspaces were designed around large four-story light monitors with access to the market hall at the base of the building to encourage gathering.

 

Photo: Spencer Lowell.

 

Each floor has its own coffee bar and a 1,000-sf café on the main level opens out to a 1,500-sf roof deck. The office’s customized workstations feature sit-to-stand desks, ergonomic monitor arms, and task lighting.

The building team includes SkB Architects (interior architecture and interior design), MKA (structural), Lima (lighting), GCH (landscape), Stantec (acoustical), Commercial Office Interiors (furniture procurement), University Mechanical (mechanical-plumbing design-build), Veca (electrical design-build), Skanska (contractor).

 

Tommy Bahama roof gardenPhoto: Magda Biernat.

 

Tommy Bahama reception areaPhoto: Magda Biernat.

Related Stories

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 13, 2012

China's high-speed building boom

A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.

| Mar 13, 2012

Worker office space to drop below 100-sf in five years

The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 1, 2012

Reconstruction Awards: Reinvesting in a neighborhood’s future

The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.

| Mar 1, 2012

Aragon Construction completes 67,000-sf build-out in NYC

Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.

| Feb 27, 2012

Research Institute at Texas Children’s Hospital building receives LEED Gold

Innovative and sustainable design reflects best environmental building practices.

| Feb 22, 2012

Siemens earns LEED certification for Maryland office

The Beltsville facility, which also earned the ENERGY STAR Label for energy performance, implemented a range of energy efficiency, water conservation and sustainable operations measures as part of the certification process.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021