flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A new Times Square hotel positions itself as a resort

Hotel Facilities

A new Times Square hotel positions itself as a resort

Margaritaville Resort arrives as New York City considers creating entertainment districts.


By John Caufield, Senior Editor | July 20, 2021
The heated pool on Margaritaville Resort's fourth floor
The heated pool on Margaritaville Resort's fourth floor

There are many beaches in New York City, including Jones Beach State Park, Coney Island, Manhattan Beach, Brighton Beach, The People’s Beach at Jacob Riis Park, Times Square …

Wait. What?

Surrounded by buildings, asphalt, concrete, and enough exterior lighting to throw off anyone’s circadian rhythm, Times Square is rarely mistaken as a place to go for relaxation. But a team of developers led by Margaritaville Hospitality Group and Soho Properties is marketing the newly opened Margaritaville Resort Times Square, located at 7th Avenue and 40th Street, as a vertical version of a vacation getaway.

This is the first of 22 Margaritaville lodging venues that isn’t horizontal.  The $370 million, 32-story hotel, rising 375 ft above street level, offers 234 rooms and five restaurants. To give the hotel its resort feel, the developers brought in The McBride Company as its interior designer. McBride has done the interiors for numerous other Margaritaville venues.

Outside one of the hotel’s restaurants, the Landshark Bar & Grill, is Times Square’s only heated year-round outdoor pool. And the building’s architectural design, by the firm Stonehill Taylor, maximizes guests’ and visitors’ views of the city.

“We don’t have a beach, but we have Times Square,” says Paul Taylor, President and Founding Partner at Stonehill Taylor, whom BD+C interviewed with the firm’s Senior Associate Steve Chew.

 

HOTEL SITS IN TWO ZONING AREAS

A view from one of the hotel's 234 rooms

The views from the hotel's 234 rooms maximize the cityscape. Image: Margaritaville Resort

 

Stonehill Taylor has been involved in at least 70 hotel projects in New York since the firm’s founding in 1986. Its design of the Margaritaville Resort began in 2014, and construction, by Flintlock Construction Services, commenced three years later.

Other building team members on this hotel project included WSP (SE and MEP), Frank Seta & Associates (façade), Jenkins & Huntington (elevator), URS (civil/geotech), and Longman Linsey (acoustics). The project's construction cost was $98 million.

The Margaritaville Resort posed some unique challenges. For one thing, the hotel—which replaces a six-story building that housed the former campus for the Parsons School of Design and a synagogue—sits between two zoning districts, so the hotel’s exterior lighting is limited, explains Chew. (Reveal Design Group was the lighting provider on this project.) In addition, the real estate footprint for this building is relatively small—9,886 sf.

To call attention to the hotel, the team incorporated a 32-ft-tall replica of the Statue of Liberty (hoisting a margarita glass, of course) into the building’s design. A five-story stairwell (an improvisation to offset some setback and street wall requirements) allows pedestrians to see up to the pool and deck on the fourth floor. The hotel’s rooftop, and several of its rooms, give guests and visitors a perfect view of the New Year’s Eve ball dropping.

One of the hotel's five restaurants

The hotel has one of the city's largest food & beverage operations. Image: Margaritaville Resort

 

Taylor notes that the building team completed this project during the coronavirus pandemic and restrictive COVID-19 jobsite protocols. “This was a new experience for us,” he says. Taylor adds that none of the hotel’s five restaurants are on its first floor, bucking what had been conventional wisdom about where hotel food and beverage venues needed to be located to be successful.

Margaritaville Resort includes nearly 5,000 sf of retail space. The ground-floor retail features 22-ft-tall ceilings. (IMCMV Holdings is the developer for the hotel’s retail and F&B spaces.) The hotel’s first floor is also the entrance to a replacement synagogue (whose reconstruction was part of the property acquisition deal) that is located on two below-street level floors.

Margaritaville Resort Times Square opened at a time when, as reported in the New York Post, the city’s Office of Nightlife has proposed creating 24-hour “entertainment districts” that would open up certain neighborhoods, possibly including Times Square, for 24/7 revelry that could contribute to the hotel’s resort atmosphere.

Related Stories

| Dec 11, 2013

Wyndham unveils hotel prototype for its Hawthorn Suites chain

The extended-stay hotel prototype reduces development costs by 46% for franchisees and enhances the overall guest experience.

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Dec 4, 2013

First look: Dubai's winning bid for World Expo 2020 [slideshow]

Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 15, 2013

Greenbuild 2013 Report - BD+C Exclusive

The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors. 

| Nov 15, 2013

Metal makes its mark on interior spaces

Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021