flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New technology, aligning training with local trends among keys to workforce development

Codes and Standards

New technology, aligning training with local trends among keys to workforce development

Construction industry must also invest in training, recruiting high school students.


By Peter Fabris, Contributing Editor | August 6, 2019

Courtesy Pixabay

Overcoming a shortage of construction workers will require new approaches by the industry, according to a new NAIOP report.

Key findings include:

— Contractors will increasingly need to adopt new technologies to improve worker productivity.

— The most successful workforce development programs rely on multi-sector collaboration.

— It is important to align workforce development programs with local trends.

— Demonstrating that a job can be part of a long-term career is key to recruitment and retention in the logistics and construction industries.

— The construction and logistics industries need to invest in training and recruiting high school students and recent graduates.

— Investing in ongoing training for current employees ensures that workers have the latest skills and improves worker recruitment and retention.

“Recent trends suggest that the construction and logistics industries cannot rely on the status quo to produce enough qualified workers to meet future demand,” according to a NAIOP news release. “Similarly, current levels of technology adoption are unlikely to result in the worker productivity growth that these industries need to become more profitable.”

Related Stories

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

Codes and Standards | Jan 24, 2022

N.Y. governor calls for ban on natural gas in new buildings

Action follows New York City’s ban.

Codes and Standards | Jan 19, 2022

EPA may expand product lineup that can earn WaterSense label

Would include systems that enhance water quality at the tap.

Codes and Standards | Jan 19, 2022

Canada’s Trudeau seeking building codes changes, net-zero emissions building strategy

Prime minister also wants net-zero electricity grid by 2035.

Codes and Standards | Jan 18, 2022

Greater emphasis on building materials needed to achieve net-zero carbon offices

Engineered wood, straw, and bamboo can be keys to achieving goal.

Codes and Standards | Jan 17, 2022

AISC seeks comments on draft earthquake standard for steel buildings

Includes new limits for cross-sectional slenderness of steel columns based on latest research.

Codes and Standards | Jan 12, 2022

California’s wildfire building code significantly reduces structural loss

As other states consider upgrading their codes, Golden State provides useful model.

Codes and Standards | Jan 12, 2022

Regulator holding back climate-friendly, energy-saving equipment deployment, critics say

Heat pumps, solar power could be made more accessible for low-income communities in Massachusetts.

Codes and Standards | Jan 11, 2022

Cost hikes drive nearly one million renters out of homeownership qualification in 2021

Household income needed to pay a mortgage rose to $62,872 from $55,186.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021