flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New surgical tower enhances healthcare services of a Long Island, N.Y., hospital

Healthcare Facilities

New surgical tower enhances healthcare services of a Long Island, N.Y., hospital

The eight-story Petrocelli Surgical Pavilion includes 132 intensive care rooms.


By John Caulfield, Senior Editor | February 6, 2024
The eight-story Petrocelli Surgical Pavilion is attached to North Shore University hospital.
The new 288,000-sf Petrocelli Surgical Pavilion is attached to North Shore University Hospital, which opened its doors 70 years ago. Images: Bernstein Associates

A building team that included the construction and development firm Skanska USA Building has completed Petrocelli Surgical Pavilion at North Shore University Hospital in Manhasset, N.Y.

North Shore is affiliated with Northwell Health, the largest healthcare provider in New York State, which invested $560 million to build the 288,000-sf pavilion tower that features 18 operating rooms (three of which are hybrid rooms with advanced imaging), and 132 intensive care rooms. This project upgrades and expands the hospital’s critical care capabilities; patients will relocate to the new critical care units, and surgeries are scheduled to begin there later this month.

The pavilion will also be new home to the Sandra Atlas Bass Heart Hospital (which had been in the existing facility), and feature a concierge entrance for cardiac patients and their families. (North Shore University Hospital delivered more cardiac care than any other healthcare system in New York State in 2022, with 660,000 ambulatory visits, 38,000 inpatient discharges, 8,700 coronary interventions, 3,900 thoracic surgeries, 3,300 cardiac surgeries, and 2,800 cardiac ablations.)

The new eight-story pavilion should also enhance the hospital’s robust heart, liver, and lung transplant programs, as well as Northwell’s academic neurosurgery department, one of the largest in the nation. The pavilion is projected to perform 2,000 of the department’s annual cases.

Project took nearly four years to complete

One of 18 operating rooms in the new tower.
The Petrocelli Surgical Pavilion has 18 operating rooms, three with advanced imaging capabilities.

Skanska USA broke ground on the Petrocelli Surgical Pavilion in April 2020. The firm deployed numerous construction technologies, including drones equipped with high-res cameras and sensors to track construction progress and site conditions. Progress with also assessed using 3D modeling and weekly 360-degree image and video capture.

“The state-of-the-art Petrocelli Surgical Pavilion will significantly augment Northwell’s ability to provide its top-ranked care to patients on Long Island,” said Sean Szatkowski, Executive Vice President and General Manager for Skanska USA Building, in a prepared statement.

CannonDesign provided architectural services for the Pavilion project. Thornton Tomasetti was the structural engineer, BR+A Consulting Engineers the MEP engineer, and Vanasse Hangen Brustlin (VHB) the civil engineer.

Related Stories

Healthcare Facilities | Nov 6, 2017

Design isn’t enough to foster collaboration in healthcare and research spaces

A new Perkins Eastman white paper finds limited employee interaction at NYU Winthrop Hospital, a year after it opened. 

Healthcare Facilities | Oct 25, 2017

Creating child-friendly healthcare spaces: Five goals for success

Children often accompany parents or grandparents in medical settings; what can we do to address their unique needs?

Greenbuild Report | Oct 23, 2017

NZE and carbon neutral

An Army hospital in the Mojave Desert sets a new bar for sustainable design.

Designers | Oct 10, 2017

Merging artwork and building design

With many hospital projects, art can be a construction-phase afterthought.

Healthcare Facilities | Oct 5, 2017

Architectural best practices for behavioral health: A case study at VCBR

Confined treatment centers for civilly-committed individuals.

Healthcare Facilities | Sep 29, 2017

Having a vision

The ability to clearly communicate specific priorities to your team is among the most important tasks the owner’s leadership team will perform.

Healthcare Facilities | Sep 21, 2017

Boat dealership becomes Tempe’s newest health clinic

The new space was designed with community input to be used by patients and non-patients alike.

Healthcare Facilities | Sep 19, 2017

Small UCHealth hospital in Longmont, Colo., designed with ability to grow over time

UCHealth Longs Peak Hospital opened for first patient on August 31.

Laboratories | Sep 12, 2017

New York City is positioning itself as a life sciences hub

A new Transwestern report highlights favorable market and regulatory changes.

Healthcare Facilities | Sep 5, 2017

Home away from home: Children’s hospitals that soothe, support, and distract

Building Teams help children’s hospitals create a sense of normalcy for patients and their families.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021