flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New study shows employees aren't happier working in green buildings

New study shows employees aren't happier working in green buildings

Occupant satisfaction with LEED-certified office building environments appears to decline with time, according to UC Berkeley reseachers.


By UC Berkeley | May 14, 2014
Think working in an environmentally green building leads to greater satisfaction in the workplace?  Think again.
 
People working in buildings certified under LEED’s green building standard appear no more satisfied with the quality of their indoor workplace environments than those toiling in conventional buildings, according to new research from the University of California, Berkeley, and the University of Nottingham in the United Kingdom.
 
The work, which counters the findings of several earlier studies examining the same issue, was done by Stefano Schiavon, an assistant professor of architecture in sustainability, energy and environment at UC Berkeley’s Center for the Built Environment (CBE) and associate professor Sergio Altomonte with the University of Nottingham’s Environmental Physics and Design Research Group.
 
The findings were published in the April issue of the journal Building and Environment and expand on Schiavon and Altomonte’s previous work on the topic by determining that most workers do not experience a higher level of workplace satisfaction simply because they work in LEED certified buildings–regardless of the building layout, amount of time in the workplace and many other factors.
 
Schiavon and Altomonte analyzed the survey responses of 21,477 individuals in 144 mainly large office buildings, most in the United States. Of those buildings, 65 are LEED certified. Previous reports by other researchers who reached different conclusions about worker satisfaction were based on much smaller sample sizes and different statistical tests.
 
“Does this mean that green certification is outdated, just costly or even useless?” asked Schiavon. “Certainly not, especially given the urgency of the environmental challenge and the fundamental role of buildings on people health and wellbeing, climate change and energy security.”
 
Schiavon and Altomonte did find that LEED-rated buildings may be more effective in providing higher occupant satisfaction when occupants are in open spaces rather than in enclosed offices, and when the buildings are smaller in size.
 
Occupant satisfaction with LEED-certified office building environments appears to decline with time, with the greatest level of satisfaction reported during the first year that a worker spends in a green building.
 
One reason for this decline may be that LEED certification is largely based on predictions, without measuring real building performance post-construction. Schiavon and Altomonte said that workplace satisfaction might improve if more design-related information could be collected by assessing LEED certified buildings based on actual operations and performance.
 
They said they hope their research leads builders and businesses to pay closer attention to: 
  • Designing strategies and solutions aimed at  influencing occupant satisfaction and feelings of health, well-being and job performance as part of the LEED certification process
  • Occupant feedback
  • The ongoing development of the LEED program  towards continuous assessment of building and people performance
 
The researchers are now studying the most effective LEED strategies for the improvement of office worker well-being and plan to report their conclusions in 2015.

Tags

Related Stories

| Nov 5, 2010

New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market

Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.

| Nov 3, 2010

First of three green labs opens at Iowa State University

Designed by ZGF Architects, in association with OPN Architects, the Biorenewable Research Laboratory on the Ames campus of Iowa State University is the first of three projects completed as part of the school’s Biorenewables Complex. The 71,800-sf LEED Gold project is one of three wings that will make up the 210,000-sf complex.

| Nov 3, 2010

Park’s green education center a lesson in sustainability

The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.

| Nov 3, 2010

Public works complex gets eco-friendly addition

The renovation and expansion of the public works operations facility in Wilmette, Ill., including a 5,000-sf addition that houses administrative and engineering offices, locker rooms, and a lunch room/meeting room, is seeking LEED Gold certification.

| Nov 3, 2010

Sailing center sets course for energy efficiency, sustainability

The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.

| Nov 3, 2010

Seattle University’s expanded library trying for LEED Gold

Pfeiffer Partners Architects, in collaboration with Mithun Architects, programmed, planned, and designed the $55 million renovation and expansion of Lemieux Library and McGoldrick Learning Commons at Seattle University. The LEED-Gold-designed facility’s green features include daylighting, sustainable and recycled materials, and a rain garden.

| Nov 3, 2010

Recreation center targets student health, earns LEED Platinum

Not only is the student recreation center at the University of Arizona, Tucson, the hub of student life but its new 54,000-sf addition is also super-green, having recently attained LEED Platinum certification.

| Nov 3, 2010

New church in Connecticut will serve a growing congregation

Tocci Building Companies will start digging next June for the Black Rock Congregational Church in Fairfield, Conn. Designed by Wiles Architects, the 103,000-sf multiuse facility will feature a 900-person worship center with tiered stadium seating, a children’s worship center, a chapel, an auditorium, a gymnasium, educational space, administrative offices, commercial kitchen, and a welcome center with library and lounge.

| Nov 3, 2010

Senior housing will be affordable, sustainable

Horizons at Morgan Hill, a 49-unit affordable senior housing community in Morgan Hill, Calif., was designed by KTGY Group and developed by Urban Housing Communities. The $21.2 million, three-story building will offer 36 one-bed/bath units (773 sf) and 13 two-bed/bath units (1,025 sf) on a 2.6-acre site.

| Nov 3, 2010

Designs complete for new elementary school

SchenkelShultz has completed design of the new 101,270-sf elementary Highlands Elementary School, as well as designs for three existing buildings that will be renovated, in Kissimmee, Fla. The school will provide 48 classrooms for 920 students, a cafeteria, a media center, and a music/art suite with outdoor patio. Three facilities scheduled for renovations total 19,459 sf and include an eight-classroom building that will be used as an exceptional student education center, a older media center that will be used as a multipurpose building, and another building that will be reworked as a parent center, with two meeting rooms for community use. W.G. Mills/Ranger is serving as CM for the $15.1 million project.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021