flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New study shows employees aren't happier working in green buildings

New study shows employees aren't happier working in green buildings

Occupant satisfaction with LEED-certified office building environments appears to decline with time, according to UC Berkeley reseachers.


By UC Berkeley | May 14, 2014
Think working in an environmentally green building leads to greater satisfaction in the workplace?  Think again.
 
People working in buildings certified under LEED’s green building standard appear no more satisfied with the quality of their indoor workplace environments than those toiling in conventional buildings, according to new research from the University of California, Berkeley, and the University of Nottingham in the United Kingdom.
 
The work, which counters the findings of several earlier studies examining the same issue, was done by Stefano Schiavon, an assistant professor of architecture in sustainability, energy and environment at UC Berkeley’s Center for the Built Environment (CBE) and associate professor Sergio Altomonte with the University of Nottingham’s Environmental Physics and Design Research Group.
 
The findings were published in the April issue of the journal Building and Environment and expand on Schiavon and Altomonte’s previous work on the topic by determining that most workers do not experience a higher level of workplace satisfaction simply because they work in LEED certified buildings–regardless of the building layout, amount of time in the workplace and many other factors.
 
Schiavon and Altomonte analyzed the survey responses of 21,477 individuals in 144 mainly large office buildings, most in the United States. Of those buildings, 65 are LEED certified. Previous reports by other researchers who reached different conclusions about worker satisfaction were based on much smaller sample sizes and different statistical tests.
 
“Does this mean that green certification is outdated, just costly or even useless?” asked Schiavon. “Certainly not, especially given the urgency of the environmental challenge and the fundamental role of buildings on people health and wellbeing, climate change and energy security.”
 
Schiavon and Altomonte did find that LEED-rated buildings may be more effective in providing higher occupant satisfaction when occupants are in open spaces rather than in enclosed offices, and when the buildings are smaller in size.
 
Occupant satisfaction with LEED-certified office building environments appears to decline with time, with the greatest level of satisfaction reported during the first year that a worker spends in a green building.
 
One reason for this decline may be that LEED certification is largely based on predictions, without measuring real building performance post-construction. Schiavon and Altomonte said that workplace satisfaction might improve if more design-related information could be collected by assessing LEED certified buildings based on actual operations and performance.
 
They said they hope their research leads builders and businesses to pay closer attention to: 
  • Designing strategies and solutions aimed at  influencing occupant satisfaction and feelings of health, well-being and job performance as part of the LEED certification process
  • Occupant feedback
  • The ongoing development of the LEED program  towards continuous assessment of building and people performance
 
The researchers are now studying the most effective LEED strategies for the improvement of office worker well-being and plan to report their conclusions in 2015.

Tags

Related Stories

| Apr 25, 2012

Missner Group names McCrory VP of property management

McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.

| Apr 25, 2012

Rogers joins Morgan/Harbour as senior project manager

Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 24, 2012

Roofing Supply Group acquired by Clayton, Dubilier & Rice

RSG provides a complete offering of residential and commercial roofing materials and related supplies.

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

| Apr 23, 2012

Vegas’ CityCenter called financial ‘black hole’

Two and a half years ago, stockholders filed six lawsuits after the stock price fell from $99.75 on Oct. 9, 2007, to $1.89 on March 5, 2009. Bondholders sued over similar steep losses.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021