flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New study shows employees aren't happier working in green buildings

New study shows employees aren't happier working in green buildings

Occupant satisfaction with LEED-certified office building environments appears to decline with time, according to UC Berkeley reseachers.


By UC Berkeley | May 14, 2014
Think working in an environmentally green building leads to greater satisfaction in the workplace?  Think again.
 
People working in buildings certified under LEED’s green building standard appear no more satisfied with the quality of their indoor workplace environments than those toiling in conventional buildings, according to new research from the University of California, Berkeley, and the University of Nottingham in the United Kingdom.
 
The work, which counters the findings of several earlier studies examining the same issue, was done by Stefano Schiavon, an assistant professor of architecture in sustainability, energy and environment at UC Berkeley’s Center for the Built Environment (CBE) and associate professor Sergio Altomonte with the University of Nottingham’s Environmental Physics and Design Research Group.
 
The findings were published in the April issue of the journal Building and Environment and expand on Schiavon and Altomonte’s previous work on the topic by determining that most workers do not experience a higher level of workplace satisfaction simply because they work in LEED certified buildings–regardless of the building layout, amount of time in the workplace and many other factors.
 
Schiavon and Altomonte analyzed the survey responses of 21,477 individuals in 144 mainly large office buildings, most in the United States. Of those buildings, 65 are LEED certified. Previous reports by other researchers who reached different conclusions about worker satisfaction were based on much smaller sample sizes and different statistical tests.
 
“Does this mean that green certification is outdated, just costly or even useless?” asked Schiavon. “Certainly not, especially given the urgency of the environmental challenge and the fundamental role of buildings on people health and wellbeing, climate change and energy security.”
 
Schiavon and Altomonte did find that LEED-rated buildings may be more effective in providing higher occupant satisfaction when occupants are in open spaces rather than in enclosed offices, and when the buildings are smaller in size.
 
Occupant satisfaction with LEED-certified office building environments appears to decline with time, with the greatest level of satisfaction reported during the first year that a worker spends in a green building.
 
One reason for this decline may be that LEED certification is largely based on predictions, without measuring real building performance post-construction. Schiavon and Altomonte said that workplace satisfaction might improve if more design-related information could be collected by assessing LEED certified buildings based on actual operations and performance.
 
They said they hope their research leads builders and businesses to pay closer attention to: 
  • Designing strategies and solutions aimed at  influencing occupant satisfaction and feelings of health, well-being and job performance as part of the LEED certification process
  • Occupant feedback
  • The ongoing development of the LEED program  towards continuous assessment of building and people performance
 
The researchers are now studying the most effective LEED strategies for the improvement of office worker well-being and plan to report their conclusions in 2015.

Tags

Related Stories

| Aug 5, 2013

Retail market shows signs of life [2013 Giants 300 Report]

Retail rentals and occupancy are finally on the rise after a long stretch in the doldrums. 

| Aug 5, 2013

Top Retail Construction Firms [2013 Giants 300 Report]

Shawmut, Whiting-Turner, PCL top Building Design+Construction's 2013 ranking of the largest retail contractor and construction management firms in the United States.

| Aug 2, 2013

Michael Baker Corp. agrees to be acquired by Integrated Mission Solutions

Michael Baker Corporation (“Baker”) (NYSE MKT:BKR) announced today that it has entered into a definitive merger agreement to be acquired by Integrated Mission Solutions, LLC (“IMS”), an affiliate of DC Capital Partners, LLC (“DC Capital”).

| Jul 31, 2013

Hotel, retail sectors bright spots of sluggish nonresidential construction market

A disappointing recovery of the U.S. economy is limiting need for new nonresidential building activity, said AIA Chief Economist, Kermit Baker in the AIA's semi-annual Consensus Construction Forecast, released today. As a result, AIA reduced its projections for 2013 spending to 2.3%.

| Jul 30, 2013

Better planning and delivery sought for VA healthcare facilities

Making Veterans Administration healthcare projects “better planned, better delivered” is the new goal of the VA’s Office of Construction and Facilities Management.

| Jul 30, 2013

Healthcare designers get an earful about controlling medical costs

At the current pace, in 2020 the U.S. will spend $4.2 trillion a year on healthcare; unchecked, waste would hit $1.2 trillion. Yet “waste” is keeping a lot of poorly performing hospitals in business, said healthcare facility experts at the recent American College of Healthcare Architects/AIA Academy of Architecture for Health Summer Leadership Summit in Chicago. 

| Jul 30, 2013

Top Healthcare Sector Architecture Firms [2013 Giants 300 Report]

HDR, HKS, Cannon top Building Design+Construction's 2013 ranking of the largest healthcare architecture and architecture/engineering firms in the U.S. 

| Jul 26, 2013

HDR acquires Sharon Greene + Associates

HDR Engineering, Inc. has acquired the business and assets of Sharon Greene + Associates, a firm specializing in transportation economics and financial analysis with offices in California and Denver. 

| Jul 26, 2013

How biomimicry inspired the design of the San Francisco Museum at the Mint

When the city was founded in the 19th century, the San Francisco Bay’s edge and marshland area were just a few hundred feet from where the historic Old Mint building sits today. HOK's design team suggested a design idea that incorporates lessons from the local biome while creating new ways to collect and store water.

| Jul 25, 2013

3 office design strategies for creating happy, productive workers

Office spaces that promote focus, balance, and choice are the ones that will improve employee experience, enhance performance, and drive innovation, according to Gensler's 2013 U.S. Workplace Survey. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021