flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New study shows employees aren't happier working in green buildings

New study shows employees aren't happier working in green buildings

Occupant satisfaction with LEED-certified office building environments appears to decline with time, according to UC Berkeley reseachers.


By UC Berkeley | May 14, 2014
Think working in an environmentally green building leads to greater satisfaction in the workplace?  Think again.
 
People working in buildings certified under LEED’s green building standard appear no more satisfied with the quality of their indoor workplace environments than those toiling in conventional buildings, according to new research from the University of California, Berkeley, and the University of Nottingham in the United Kingdom.
 
The work, which counters the findings of several earlier studies examining the same issue, was done by Stefano Schiavon, an assistant professor of architecture in sustainability, energy and environment at UC Berkeley’s Center for the Built Environment (CBE) and associate professor Sergio Altomonte with the University of Nottingham’s Environmental Physics and Design Research Group.
 
The findings were published in the April issue of the journal Building and Environment and expand on Schiavon and Altomonte’s previous work on the topic by determining that most workers do not experience a higher level of workplace satisfaction simply because they work in LEED certified buildings–regardless of the building layout, amount of time in the workplace and many other factors.
 
Schiavon and Altomonte analyzed the survey responses of 21,477 individuals in 144 mainly large office buildings, most in the United States. Of those buildings, 65 are LEED certified. Previous reports by other researchers who reached different conclusions about worker satisfaction were based on much smaller sample sizes and different statistical tests.
 
“Does this mean that green certification is outdated, just costly or even useless?” asked Schiavon. “Certainly not, especially given the urgency of the environmental challenge and the fundamental role of buildings on people health and wellbeing, climate change and energy security.”
 
Schiavon and Altomonte did find that LEED-rated buildings may be more effective in providing higher occupant satisfaction when occupants are in open spaces rather than in enclosed offices, and when the buildings are smaller in size.
 
Occupant satisfaction with LEED-certified office building environments appears to decline with time, with the greatest level of satisfaction reported during the first year that a worker spends in a green building.
 
One reason for this decline may be that LEED certification is largely based on predictions, without measuring real building performance post-construction. Schiavon and Altomonte said that workplace satisfaction might improve if more design-related information could be collected by assessing LEED certified buildings based on actual operations and performance.
 
They said they hope their research leads builders and businesses to pay closer attention to: 
  • Designing strategies and solutions aimed at  influencing occupant satisfaction and feelings of health, well-being and job performance as part of the LEED certification process
  • Occupant feedback
  • The ongoing development of the LEED program  towards continuous assessment of building and people performance
 
The researchers are now studying the most effective LEED strategies for the improvement of office worker well-being and plan to report their conclusions in 2015.

Tags

Related Stories

Building Team | Jul 12, 2022

10 resource reduction measures for more efficient and sustainable biopharma facilities

Resource reduction measures are solutions that can lead to lifecycle energy and cost savings for a favorable return on investment while simultaneously improving resiliency and promoting health and wellness in your facility.

Office Buildings | Jul 12, 2022

Miami office tower nears completion, topping off at 55 stories

In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion.

University Buildings | Jul 11, 2022

Student life design impacts campus wellness

As interior designers, we have the opportunity and responsibility to help students achieve deeper levels of engagement in their learning, social involvement, and personal growth on college campuses.

Museums | Jul 11, 2022

Denmark opens a museum that tells the stories of refugees worldwide

Located on the site of Denmark’s largest World War II refugee camp, the new Refugee Museum of Denmark, FLUGT, tells the stories of refugees from the camp as well as refugees worldwide. 

Codes and Standards | Jul 8, 2022

Inefficient supply chains, outdated project delivery systems hamper construction investment

Constructing and justifying the cost of physical assets such as a manufacturing plant is much more difficult than it was decades ago, according to a report by Steffen Fuchs, senior partner with McKinsey & Company.

Airports | Jul 8, 2022

Phoenix Sky Harbor Airport’s new terminal prioritizes passenger experience and sustainability

McCarthy Building Companies recently completed construction of the final concourse in Terminal 4 at Phoenix Sky Harbor International Airport.

Architects | Jul 7, 2022

Page acquires AE giant EYP to form 1,300-person international design firm

The combined firm will “be able to invest in research and thought leadership to co-create with our clients,” stated Page CEO Thomas McCarthy.

Building Team | Jul 7, 2022

Report explores improving architect/contractor relationship

A new study by the American Institute of Architects and the Associated General Contractors of America focuses on improving the relationship between architects and contractors.

Airports | Jul 7, 2022

Love at first flight: The power of first impressions in airports

As architects, how we design a terminal and choreograph the passenger experience can stir up strong feelings.

Building Team | Jul 7, 2022

Amenity-rich rental property in Chicago includes seven-story atrium with vertical landscaping

The recently opened 198-unit Optima Lakeview luxury rental apartment building in Chicago is bursting with amenities such as the region’s first year-round rooftop pool, contact-free in-home package delivery, housekeeping services, on-site room service, fitness programming, and a virtual personal assistant.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021