flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New solar-ready mandate affects commercial and residential buildings in St. Louis

Codes and Standards

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.


By Peter Fabris, Contributing Editor | January 16, 2020

Courtesy Pixabay

St. Louis recently passed a new law requiring all new buildings to be made solar-ready.

All new structures—commercial and residential—must reserve rooftop sections for solar panels to be easily installed. The ordinance does not mandate that rooftop solar be installed.

The solar-ready zone must be at least 40% of the roof area. It can be one contiguous area or multiple smaller sub-zone areas that are no less than five feet in width at their narrowest point. The solar-ready area cannot be obstructed by pipes, vents, HVAC equipment, or other shadow-casting elements.

Construction documents must outline pathways for routing of piping from the solar-ready zone to the building’s electrical service panel or service hot water system. The electrical panel must also have reserved space for a dual-pole circuit breaker to support future solar installations.

New buildings that have permanently-installed onsite generation systems already, buildings whose solar-ready zones would be shaded from sunlight for more than 70% of the day, and buildings where a licensed design professional has deemed that the solar radiation available to the building is not suitable to a solar-ready zone or because the area requirement cannot be met due to extensive rooftop obstructions, may be exempt.

Related Stories

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â