flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New solar-ready mandate affects commercial and residential buildings in St. Louis

Codes and Standards

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.


By Peter Fabris, Contributing Editor | January 16, 2020

Courtesy Pixabay

St. Louis recently passed a new law requiring all new buildings to be made solar-ready.

All new structures—commercial and residential—must reserve rooftop sections for solar panels to be easily installed. The ordinance does not mandate that rooftop solar be installed.

The solar-ready zone must be at least 40% of the roof area. It can be one contiguous area or multiple smaller sub-zone areas that are no less than five feet in width at their narrowest point. The solar-ready area cannot be obstructed by pipes, vents, HVAC equipment, or other shadow-casting elements.

Construction documents must outline pathways for routing of piping from the solar-ready zone to the building’s electrical service panel or service hot water system. The electrical panel must also have reserved space for a dual-pole circuit breaker to support future solar installations.

New buildings that have permanently-installed onsite generation systems already, buildings whose solar-ready zones would be shaded from sunlight for more than 70% of the day, and buildings where a licensed design professional has deemed that the solar radiation available to the building is not suitable to a solar-ready zone or because the area requirement cannot be met due to extensive rooftop obstructions, may be exempt.

Related Stories

Resiliency | Feb 16, 2016

Obama establishes federal earthquake risk management standard

The standard requires federal agencies to use earthquake-resistant design provisions in current building codes.

Codes and Standards | Feb 12, 2016

Huge fraud case involving alleged engineering impostors uncovered in California

Hundreds of buildings may have to be demolished.  

Codes and Standards | Feb 11, 2016

New York governor makes emergency design-build authorization

The declaration was issued in response to Winter Storm Jonas which dumped over 18 inches of snow in parts of the state.

Green | Jan 29, 2016

USGBC names top 10 states for LEED green building

Illinois leads the list for the third straight year.

Codes and Standards | Jan 25, 2016

Dept. of Energy releases decision guides for plug and process loads

Plug and process loads consume about 30% of the primary energy in U.S. commercial buildings today.

Codes and Standards | Jan 22, 2016

ConsensusDocs releases new multi-party IPD agreement and joining agreement

The documents serve as a comprehensive revision of previous IPD agreement

Codes and Standards | Jan 22, 2016

State Savings Calculator analyzes savings associated with energy codes

The calculator breaks down the cost-effectiveness of energy codes on a state-by-state basis.

Codes and Standards | Jan 22, 2016

Metal Roofing Seaming Guide published by Metal Construction Association

The free document is specifically tailored for metal roof installation.

Codes and Standards | Jan 22, 2016

Treasury Dept. will start crackdown on illicit money in luxury real estate

The move is expected to impact high-end condo development.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021