flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New solar-ready mandate affects commercial and residential buildings in St. Louis

Codes and Standards

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.


By Peter Fabris, Contributing Editor | January 16, 2020

Courtesy Pixabay

St. Louis recently passed a new law requiring all new buildings to be made solar-ready.

All new structures—commercial and residential—must reserve rooftop sections for solar panels to be easily installed. The ordinance does not mandate that rooftop solar be installed.

The solar-ready zone must be at least 40% of the roof area. It can be one contiguous area or multiple smaller sub-zone areas that are no less than five feet in width at their narrowest point. The solar-ready area cannot be obstructed by pipes, vents, HVAC equipment, or other shadow-casting elements.

Construction documents must outline pathways for routing of piping from the solar-ready zone to the building’s electrical service panel or service hot water system. The electrical panel must also have reserved space for a dual-pole circuit breaker to support future solar installations.

New buildings that have permanently-installed onsite generation systems already, buildings whose solar-ready zones would be shaded from sunlight for more than 70% of the day, and buildings where a licensed design professional has deemed that the solar radiation available to the building is not suitable to a solar-ready zone or because the area requirement cannot be met due to extensive rooftop obstructions, may be exempt.

Related Stories

Codes and Standards | May 30, 2017

Industry Groups move toward Unified Green Building Model Code in 2018

The effort involves combining ASHRAE's Standard 189.1 with the International Green Construction Code.

Codes and Standards | May 30, 2017

OSHA suspends electronic injury, illness reporting requirement

The agency is keeping records from being publicly disclosed—for now.

Codes and Standards | May 30, 2017

Florida preparing to adjust to new building elevation requirements

New floodplain maps and state code changes loom.

Codes and Standards | May 30, 2017

Heated debate over whether Calif.’s prevailing wage requirement stymies affordable housing

There’s disagreement around how much pay regulations add to cost of projects.

Codes and Standards | May 25, 2017

Technology is influencing parking requirement codes in new developments

Uber and Lyft make it easier for urban dwellers to live without owning cars.

Codes and Standards | May 25, 2017

Better Buildings Challenge Partners on track to reduce energy usage by 20% in 10 years

More than 1,000 proven solutions are now available on DOE web site.

Codes and Standards | May 22, 2017

Amid labor shortage, industry groups urge government action to boost trades

AGC says a shortage of qualified workers is limiting the economy from adding more jobs.

Codes and Standards | May 19, 2017

Spate of sinkhole incidents points to neglected infrastructure investment

Suddenly appearing caverns cause deaths, evacuations, interruption of utility services.

Codes and Standards | May 18, 2017

AIA releases updated edition of its A201 flagship documents

These core documents are updated once a decade.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021