flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New School’s University Center in NYC topped out

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.


By Posted by Tim Gregorski, Senior Editor | May 31, 2012
From left to right: Jody Durst, David Van Zandt, John Tishman, Daniel Tishman, D
From left to right: Jody Durst, David Van Zandt, John Tishman, Daniel Tishman, Douglas Durst and Roger Duffy celebrate the "topp

Professionals from Tishman Construction Corporation (TCC), an AECOM company, Leaders and Trustees of The New School, and hundreds of construction tradespeople celebrated the "topping out" of the University Center, marking the completion of vertical construction. Located at 65 Fifth Avenue between 14th and 13th Streets the 16-story University Center will provide a new focal point for The New School, which over the past decade has transformed into a major degree-granting university.

The University Center is The New School's largest-ever construction project, adding to the university's Greenwich Village campus 375,000-sf of classrooms, a library, an auditorium, a 608-bed student residence, and other facilities. Designed by SOM's award-winning architect Roger Duffy, the University Center will serve as a central meeting point for students and faculty across the university's disciplines, including art and design, liberal arts, social research, and the performing arts.

In addition, the University Center will be one of New York's greenest buildings, with a projected LEED Gold rating, and innovative sustainability features including a rainwater-saving green roof, for which The New School recently received a grant from the New York City Department of Environmental Protection. +

Related Stories

| Feb 23, 2011

Architecture Billings hold steady after two months of improving conditions

After showing positive momentum during the fourth quarter of 2010, the Architecture Billings Index (ABI) slipped almost four points in January. The January ABI score was 50.0, which is down from a reading of 53.9 the previous month, but still reflects stable demand for design services. Any score above 50 indicates an increase in billings.

| Feb 22, 2011

LEED Volume Program celebrates its 500th certified Pilot Project

More than 500 building projects have certified through the LEED Volume Program since the pilot launched in 2006, according to the U.S. Green Building Council. The LEED Volume Program streamlines the certification process for high-volume property owners and managers, from commercial real estate firms, national retailers and hospitality providers, to local, state and federal governments.

| Feb 22, 2011

HDR Architecture names four healthcare directors

Four senior professionals in HDR Architecture’s healthcare program have been named Healthcare directors.

| Feb 15, 2011

Iconic TWA terminal may reopen as a boutique hotel

The Port Authority of New York and New Jersey hopes to squeeze a hotel with about 150 rooms in the space between the old TWA terminal and the new JetBlue building. The old TWA terminal would serve as an entry to the hotel and hotel lobby, which would also contain restaurants and shops.

| Feb 15, 2011

New Orleans' rebuilt public housing architecture gets mixed reviews

The architecture of New Orleans’ new public housing is awash with optimism about how urban-design will improve residents' lives—but the changes are based on the idealism of an earlier era that’s being erased and revised.

| Feb 15, 2011

LAUSD commissions innovative prefab prototypes for future building

The LA Unified School District, under the leadership of a new facilities director, reversed course regarding prototypes for its new schools and engaged architects to create compelling kit-of-parts schemes that are largely prefabricated.

| Feb 15, 2011

New 2030 Challenge to include carbon footprint of building materials and products

Architecture 2030 has just broadened the scope of its 2030 Challenge, issuing an additional challenge regarding the climate impact of building products. The 2030 Challenge for Products aims to reduce the embodied carbon (meaning the carbon emissions equivalent) of building products 50% by 2030.

| Feb 15, 2011

New Urbanist Andrés Duany: We need a LEED Brown rating

Andrés Duany advocates a "LEED Brown" rating that would give contractors credit for using traditional but low cost measures that are not easy to quantify or certify. He described these steps as "the original green," and "what we did when we didn't have money." Ostensibly, LEED Brown would be in addition to the current Silver, Gold and Platinum ratings.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021