Professionals from Tishman Construction Corporation (TCC), an AECOM company, Leaders and Trustees of The New School, and hundreds of construction tradespeople celebrated the "topping out" of the University Center, marking the completion of vertical construction. Located at 65 Fifth Avenue between 14th and 13th Streets the 16-story University Center will provide a new focal point for The New School, which over the past decade has transformed into a major degree-granting university.
The University Center is The New School's largest-ever construction project, adding to the university's Greenwich Village campus 375,000-sf of classrooms, a library, an auditorium, a 608-bed student residence, and other facilities. Designed by SOM's award-winning architect Roger Duffy, the University Center will serve as a central meeting point for students and faculty across the university's disciplines, including art and design, liberal arts, social research, and the performing arts.
In addition, the University Center will be one of New York's greenest buildings, with a projected LEED Gold rating, and innovative sustainability features including a rainwater-saving green roof, for which The New School recently received a grant from the New York City Department of Environmental Protection. +
Related Stories
| Oct 4, 2012
Foundation tightens HMC Architects bond with local communities
Founded in 2009 with an initial endowment of $1.9 million, HMC’s nonprofit Designing Futures Foundation (DFF) has donated about $230,000 in its three years of existence, including $105,000 in scholarships to California students. The grants help promising high schoolers with an interest in architecture, design, engineering, education, or healthcare pay for expenses like test preparation services, computers, and college entrance exam fees and tuition. The scholarships can be extended for up to five years of college.
| Oct 4, 2012
Gilbane publishes Fall 2012 construction industry economic report
Report outlines fluctuation in construction spending; predicts continued movement toward recovery.
| Oct 3, 2012
Fifth public comment period now open for update to USGBC's LEED Green Building Program
LEED v4 drafts and the public comment tool are now available on the newly re-launched, re-envisioned USGBC.org website.
| Oct 2, 2012
Mirvish and Gehry unveil conceptual design to transform Toronto’s entertainment district
Reimagining of King Street Entertainment District supports Toronto’s cultural corridor.
| Oct 2, 2012
Dow Business Services Center building named 2012 “America’s Best Buildings of the Year” winner
Building constructed with air sealing and insulation products from Dow Building Solutions.
| Oct 2, 2012
Bernards working on project at L.A. White Memorial Medical Center
The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.
| Oct 1, 2012
Tyco completes separation process, now largest pure-play fire protection and security business
Tyco Integrated Security focused on delivering security solutions to commercial businesses.
| Sep 28, 2012
Seattle is home to first LEED-certified modular radiation center
By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.
| Sep 26, 2012
EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue
Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.
| Sep 24, 2012
Reed Construction completes Lafarge headquarters in Chicago
Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.