flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New San Francisco mixed-use tower billed as most earthquake-resistant building on the West Coast

High-rise Construction

New San Francisco mixed-use tower billed as most earthquake-resistant building on the West Coast

A megabrace is a key seismic component at 181 Fremont, with offices, residences, and retail space.


By John Caulfield, Senior Editor | July 14, 2016

Welding has begun on a 70-story-tall office and residential tower in earthquake prone San Franciso that claims it can resist a 500-year earthquake, and be back in full operation within a month after a catastrophic event. Image: Courtesy of 181 Fremont

The developer of 181 Fremont, a 70-story residential and office tower being built in San Francisco, claims this will be the most earthquake-resistant building on the West Coast when it is completed in the summer of 2017.

Jay Paul Company acquired this development from SKS Investments in 2013, and estimates its cost at $665 million. The Class A building will include 432,000 sf of office space, 67 luxury condos on its top 17 floors, and 3,000 sf of retail space.

The building’s architecture (by Heller Manus), residential interior design (by Orlando Diaz-Azcuy) and engineering (by Arup) revolve around a unique megabrace that, according to the developer, would virtually eliminate structural damage from a significant (i.e., 500-year) earthquake. Jay Paul also believes this design could set new standards for earthquake resilience for urban development.

The resilience-based design focuses on saving lives and minimizing structural damage, property loss, and protection of the building’s MEP systems. The building features a sawtooth curtainwall, passive solar energy, and a water-recycling system. It’s the only residential tower in San Francisco to be pre-certified LEED Platinum.

“The seismic design is consistent with our approach to position 181 Fremont as the preeminent tower in San Francisco in every aspect of design and development,” said Matt Lituchy, CIO of Jay Paul Company.

181 Fremont’s calling card is its claim that a seismic event wouldn’t disrupt the building’s business continuity. Occupants and businesses would be able to return to the tower with complete access to business operations, and the building would be fully functional again, within one month. The elevator systems are also designed for continuous operation during a catastrophic event, with contingencies for emergency evacuations.

The tower is adjacent to the new Transbay Transit Center.

Related Stories

BIM and Information Technology | Apr 5, 2016

Interactive 3D map shows present and future Miami skyline

The Downtown Miami Interactive 3-D Skyline Map lets users see the status of every downtown office, retail, residential, and hotel project. 

High-rise Construction | Mar 28, 2016

SOM’s Salt Lake City skyscraper uses innovative structural system to suspend itself over a neighboring building

The hat truss-supported office tower was topped off in January, rising 25 stories above the Salt Lake City streets.

High-rise Construction | Mar 18, 2016

'High-Rise' movie, based on the novel of the same name, headed to theaters

The story, which was originally thought to be a critique of London’s city planning, takes place in a high-rise divided to mimic the historical class structure of Western society.

High-rise Construction | Mar 10, 2016

Bigger, taller, wider: London’s skyline is about to have a major growth spurt

More than 100 tall buildings have been added to the plans for the capital city since this time last year, and the overall number of tall buildings planned for London is now over 400.

High-rise Construction | Mar 8, 2016

Weston Williamson designs vertical neighborhood with ‘kissing towers’ in Hong Kong

The towers will connect between the 21st and 25th floors. The entire complex will sit above a high-speed rail line.

High-rise Construction | Mar 7, 2016

Russian architect Vasily Klyukin unveils design for Asian Cobra Tower

The skyscraper, which can change colors and would house a nightclub in its "mouth," is the latest idea from an unconventional thinker.

High-rise Construction | Mar 3, 2016

LA's U.S. Bank Tower to build exterior glass slide leading from 70th to 69th floors

The glass slide, part of a $50 million renovation project, will stretch 45 feet along the exterior of the building.

High-rise Construction | Mar 3, 2016

HOK’s Hertsmere House will be Western Europe’s tallest residential tower

Recently approved for development, the 67-story building will have more than 900 units.

High-rise Construction | Feb 29, 2016

China’s best new skyscrapers: Wangjing SOHO and Asia Pacific Tower are among CTBUH award winners

The award program’s first year honored projects, designers, and builders stretched across six distinct awards categories for high-rise construction.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021