A pilot program of plug load energy reduction strategies at a large office property yielded findings pertaining to tenant education and advance power strip technologies that can help building owners reduce energy consumption.
The Tower Companies conducted the study at a downtown Washington D.C. office building in which they implemented a “Turn it Off!” campaign to encourage building occupants to reduce plug loads. The building was equipped with advanced power strips (APSs) used to plug multiple electronic devices into a wall outlet with built-in technology to reduce plug and process load (PPL) runtimes and save energy when the devices are not in use.
The Tower Companies worked with the Better Buildings Initiative to gain guidance and support on project design, implementation, and analysis. Decision guides and technical specification were created as a result of this program and are available here.
PPLs account for an increasingly large percentage of commercial building energy use. The primary energy use associated with PPLs is projected to grow from 30% to 35% of total commercial building energy use between 2010 and 2025 as the number and energy intensity of plug-in devices continue to increase.
Related Stories
Codes and Standards | Feb 16, 2021
Bechtel joins international heat resilience organization
Experience designing resilience standards to aid effort to protect communities from extreme heat.
Codes and Standards | Feb 10, 2021
More than two-thirds of construction companies say COVID-19 has not impacted their ESOP
Half of survey respondents say 2020 project profitability decreased due to pandemic.
Codes and Standards | Feb 9, 2021
New Jersey approves new electric vehicle-ready home requirement
Homebuyers must be given option for charging station on new construction.
Codes and Standards | Feb 9, 2021
New California law removes barriers to residential development
Measure removes restrictions for ADUs in urban areas and master planned communities.
Codes and Standards | Feb 8, 2021
Alliance yields more accurate data for rating and certifying systems of construction materials
Crosswalk API offers trusted format to specify and procure healthier products.
Codes and Standards | Feb 4, 2021
2021 IBC requires automatic doors for entrances to public buildings
One door must be either a full power-operated door or a low-energy power-operated door.
Codes and Standards | Feb 3, 2021
Two new International Code Council online code tools released
Offer detailed information about global building code usage and U.S. adoptions.
Codes and Standards | Feb 2, 2021
Biden tells OSHA to bolster COVID-19 safety rules
Order could lead to a national playbook for fighting COVID-19 on jobsites.
Codes and Standards | Feb 1, 2021
Fenestration Alliance updates standard for mulled combination assemblies
Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.
Codes and Standards | Jan 28, 2021
Natl. Fire Protection Assn. releases new energy storage system fact sheet
Comes as Biden Administration prepares ambitious clean energy agenda.