flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New resources available to reduce plug loads using advanced power strips

Codes and Standards

New resources available to reduce plug loads using advanced power strips

A tenant education program can boost efficiency in office buildings.


By Peter Fabris, Contributing Editor | November 2, 2016

Pixabay Public Domain

A pilot program of plug load energy reduction strategies at a large office property yielded findings pertaining to tenant education and advance power strip technologies that can help building owners reduce energy consumption.

The Tower Companies conducted the study at a downtown Washington D.C. office building in which they implemented a “Turn it Off!” campaign to encourage building occupants to reduce plug loads. The building was equipped with advanced power strips (APSs) used to plug multiple electronic devices into a wall outlet with built-in technology to reduce plug and process load (PPL) runtimes and save energy when the devices are not in use.

The Tower Companies worked with the Better Buildings Initiative to gain guidance and support on project design, implementation, and analysis. Decision guides and technical specification were created as a result of this program and are available here.

PPLs account for an increasingly large percentage of commercial building energy use. The primary energy use associated with PPLs is projected to grow from 30% to 35% of total commercial building energy use between 2010 and 2025 as the number and energy intensity of plug-in devices continue to increase.

Related Stories

Codes and Standards | Jul 7, 2021

Bechtel, Nautilus partner on sustainable, high-performance data centers

Facilities would use 70% less power for cooling, eliminate consumption of drinking water.

Codes and Standards | Jul 7, 2021

Surfside condo collapse could spur new legislation

Natl. Institute of Standards and Technology is investigating.

Codes and Standards | Jul 7, 2021

Intl. Code Council appoints committees to lead energy code development

One-third of appointees are government regulators.

Codes and Standards | Jul 1, 2021

COVID-19 made payment delays to contractors much worse

Only one in ten companies is always getting paid in full.

Codes and Standards | Jun 30, 2021

New resource for public sector organizations to develop energy data management program

Dept. of Energy document contains more than 30 examples of successful implementations.

Codes and Standards | Jun 29, 2021

Biden China policy may spur more increased U.S. PV manufacturing capacity

Senate bill proposes advanced solar manufacturing production credit.

Codes and Standards | Jun 28, 2021

Local and state building energy performance standards aim to curb climate change

Owners must up the ante on operations and retrofits.

Codes and Standards | Jun 24, 2021

Biden Administration will restore ‘Waters of the U.S.’ protections ended by Trump

Early revision more likely to hold up in court, says legal expert.

Codes and Standards | Jun 23, 2021

Denver unveils renewable heating and cooling plan

City releases roadmap to decarbonizing existing homes and buildings.

Codes and Standards | Jun 22, 2021

Actually, few companies plan to significantly reduce their office footprint

CBRE survey shows that many firms will continue with hybrid work.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021