flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New resources available to reduce plug loads using advanced power strips

Codes and Standards

New resources available to reduce plug loads using advanced power strips

A tenant education program can boost efficiency in office buildings.


By Peter Fabris, Contributing Editor | November 2, 2016

Pixabay Public Domain

A pilot program of plug load energy reduction strategies at a large office property yielded findings pertaining to tenant education and advance power strip technologies that can help building owners reduce energy consumption.

The Tower Companies conducted the study at a downtown Washington D.C. office building in which they implemented a “Turn it Off!” campaign to encourage building occupants to reduce plug loads. The building was equipped with advanced power strips (APSs) used to plug multiple electronic devices into a wall outlet with built-in technology to reduce plug and process load (PPL) runtimes and save energy when the devices are not in use.

The Tower Companies worked with the Better Buildings Initiative to gain guidance and support on project design, implementation, and analysis. Decision guides and technical specification were created as a result of this program and are available here.

PPLs account for an increasingly large percentage of commercial building energy use. The primary energy use associated with PPLs is projected to grow from 30% to 35% of total commercial building energy use between 2010 and 2025 as the number and energy intensity of plug-in devices continue to increase.

Related Stories

Healthcare Facilities | Jun 10, 2016

Top 10 health technology hazards include some influenced by space design

ECRI Institute’s annual list includes operational and workflow issues.  

Codes and Standards | Jun 9, 2016

Supreme Court ruling could aid developers on properties containing wetlands

Unanimous decision allows landowners to take regulatory decisions straight to court.

Green | Jun 8, 2016

TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1

The newly renovated 25,000-sf space achieved gold-level status.

Concrete | Jun 7, 2016

Concrete Institute publishes document providing concrete curing guidance

New curing monitoring techniques included.  

Energy | Jun 7, 2016

Energy modeling payback typically as short as one to two months

Energy modeling is a ‘no-brainer—like checking MPG on a car’

Green | Jun 2, 2016

USGBC offers new LEED pilot credit: Building Material Human Hazard and Exposure Assessment

For assessing human health-related exposure scenarios for construction products.

Resiliency | Jun 1, 2016

Federal agencies boost standards for more resilient construction

HUD, FEMA, GSA, Army Corps of Engineers make policy changes.    

Green | May 31, 2016

Miami Beach requires developers to meet green standards or pay a fee

Applies to structures larger than 7,000 sf.  

Codes and Standards | May 27, 2016

Better enforcement needed for successful implementation of energy efficiency policies

Commercial buildings the focus of recent code initiatives.  

Codes and Standards | May 25, 2016

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.  

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021