flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New resort will be carved directly into a mountainside

Hotel Facilities

New resort will be carved directly into a mountainside

The project is is located in western Saudi Arabia.


By David Malone, Managing Editor | September 27, 2021
Desert Rock resort
Image courtesy Luxigon

A new resort has broken ground in Saudi Arabia with the goal of redefining the concept of sustainable architecture. Dubbed Desert Rock, the project is the first inland resort of The Red Sea Project, a destination comprising 50 resorts, 8,000 hotel rooms, and 1,000 residential properties across 22 islands and six inland sites.

The resort will not be built on a mountainside but will instead be carved directly into the ancient rock itself. The materials removed to carve into the site will then be reused to create the resort’s infrastructure.

Aerial of Desert Rock in Saudi Arabia
Image courtesy Luxigon.

The ground stone and existing sand will be used for concrete aggregate, which will be the main building material for all the architecture. Using the excavated material to build the project will ensure that it will have the same integral colors as the surrounding landscape, further immersing the architecture in its setting. Water retention and distribution systems will be used throughout the site, with harvested rainwater used to create a more green, flourishing wadi.

Desert Rock suite
Image courtesy Luxigon.

Desert Rock will feature 48 luxury villas and 12 hotel rooms that all offer panoramic views of the surrounding desert. A range of accommodation will be available, from ground level dwellings to crevice hotel suites midway up the mountain. A select number of excavated rooms will be located within the rock massif itself.

Resort amenities will include a spa and fitness center, remote destination dining areas, and a feature lagoon oasis. Guests will be able to hike, use dune buggies, and star gaze as part of the site-wide activities program.

Oppenheim Architecture designed the project. The Red Sea Development Company is the developer. Desert Rock is slated to welcome its first guests by the end of 2022.

View from Desert Rock suite
Image courtesy Luxigon.
Desert rock interior ensuite
Image courtesy Luxigon.
Desert Rock full resort
Image courtesy Luxigon.

 

Related Stories

| May 20, 2014

Kinetic Architecture: New book explores innovations in active façades

The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.

| May 20, 2014

World's best new skyscrapers: Renzo Piano's The Shard, China's 'doughnut hotel' voted to Emporis list

Eight other high-rise projects were named Emporis Skyscraper Award winners, including DC Tower 1 by Dominique Perrault Architecture and Tour Carpe Diem by Robert A.M. Stern. 

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 12, 2014

10 highest-rated green hotels in the U.S.

The ARIA Sky Suites in Las Vegas and the Lenox Hotel in Boston are among the 10 most popular hotels (according to user reviews) to also achieve Platinum status in TripAdvisor's GreenLeaders program.

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| May 9, 2014

It's official: Norman Foster-designed Harmon hotel and casino to be razed due to structural issues

Construction of the Las Vegas tower was halted in 2008 after experts discovered faulty steel beams in the structure. Now its owner, MGM, has received permission to demolish the building. 

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 28, 2014

Welcome to the Hive: OVA designs wild shipping container hotel for competition

Hong Kong-based OVA envisions a shipping-container hotel, where rooms could be removed at will and designed by advertisers.

| Apr 16, 2014

Upgrading windows: repair, refurbish, or retrofit [AIA course]

Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.

| Apr 15, 2014

First look: Zaha Hadid reveals designs for dreamy sculptural hotel - CORRECTED

Hadid's design, which will become the fifth hotel tower in the City of Dreams entertainment hub, features a latticed exoskeleton enveloping the building's exterior. The 40-floor, 150,000-square-foot space is envisioned as a monolith with voids carved throughout. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021