flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New report addresses sound transmission of wood-framed assemblies

Codes and Standards

New report addresses sound transmission of wood-framed assemblies

AWC document provides empirical sound transmission model.


By Peter Fabris, Contirbuting Editor | November 7, 2018

The American Wood Council (AWC) released a new report on sound transmission, “Technical Report 15 (TR15), Calculation of Sound Transmission Parameters for Wood-Framed Assemblies.”

“Building codes stipulate minimum performance requirements regarding noise transmission through certain interior walls, partitions, and floor-ceiling assemblies,” according to AWC Vice President of Engineering Brad Douglas. “This initial version of TR15 summarizes how these code provisions apply to floor-ceiling assemblies and demonstrates how wood-framed floor-ceiling assemblies can comply with a calculation-based analysis approach.”

The 2018 International Building Code provides two parameters to establish minimum acoustical requirements: Sound Transmission Class (STC) and Impact Insulation Class (IIC). Compliance with these requirements may be demonstrated either through testing or through engineering analysis based on empirical test data from other similar assemblies.

The new report shows how to use the new AWC empirical model, and may be used for analysis of wood-frame floor-ceiling assemblies to determine compliance with STC and IIC sound transmission parameters.

Related Stories

Codes and Standards | Dec 16, 2020

Resources available to address Legionella threat

Buildings reopened after extended pandemic closure are at risk.

Codes and Standards | Dec 16, 2020

New Specifications for Concrete Construction reference manual released

Scope expanded to include shotcrete, internal curing, mineral fillers, and recycled concrete aggregates.

Codes and Standards | Dec 15, 2020

Despite COVID-19 population flight, don’t write off big cities yet

Lure of urban life and jobs may draw people back after pandemic subsides.

Codes and Standards | Dec 10, 2020

Test method for vertical fenestration installation procedures updated

FGIA issues first update for document created in 2005.

Codes and Standards | Dec 9, 2020

Newly formed Rainscreen Association aims to be recognized authority on rainscreen assemblies

Will address innovations in material performance and building designs.

Codes and Standards | Dec 9, 2020

Investors want building resiliency plans and risk mitigation practices

Owners should assess risk, insurance coverage, and ability to withstand disasters.

Codes and Standards | Dec 4, 2020

OSHA cites more than 200 employers for COVID-19 violations

Agency releases guidance on lessons learned from pandemic inspections.

Codes and Standards | Dec 1, 2020

Pandemic spurs nearly 16 million people to move from major cities

Most of the movement seems permanent.  

Codes and Standards | Nov 30, 2020

USGBC ready to catalyze LEED Positive future

New programs, updates will spur shift to regenerative strategies.  

boombox1
boombox2
native1

More In Category

Contractors

Conflict resolution is a critical skill for contractors

Contractors interact with other companies seventeen times a day on average, and nearly half of those interactions (eight) involve conflicts, according to a report by Dodge Construction Network and Dusty Robotics. The study suggests that specialty trade contractors, in particular, rarely experience good resolution from conflicts. 



Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021