flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New renderings provide glimpse into large mixed-use project, Circa

Mixed-Use

New renderings provide glimpse into large mixed-use project, Circa

The $500 million complex will begin pre-leasing in winter, 2017 and open for move-in early in 2018. 


By David Malone, Associate Editor | January 26, 2017

Rendering courtesy of Circa.

A massive 2.7-acre mixed-use development in Los Angeles is promising to be the city’s next premier rental location when it opens in early 2018. The development, dubbed Circa, is located in the heart of the South park District at 1200 S. Figueroa Street and sits directly across from the Staples Center and L.A. Live.

The two 35-story towers comprise 648 luxury rental units and sit on a seven-story podium that also provides 48,000 sf of ground level retail space. Overall, the project provides 2 million sf of mixed-use space. Apartment units are available in one-bedroom, two-bedroom, and penthouse options that range from 700 to 3,800 sf.

Each unit has European high-end finishes and, thanks to the oval shape used for both towers, open viewing corridors of Los Angeles County and the Pacific Ocean. On top of the seven-story podium, an entertainment deck provides BBQ stations, private open-air dining areas, fire pits and fireplaces, and two dog parks with owners’ lounges.

The Circa Club House is adjacent to the west tower and includes an indoor bar, private chef’s dining room, pool tables with 12 large event screens, and an outdoor bar with a fireplace facing the Staples Center.  The clubhouse level also features a large circular pool and a lap pool. Additional amenities for residents include a fitness building with indoor and outdoor space for Pilates and yoga, a library-wine bar, and a business center neighboring the east tower sky lobby.

As for the retail space, current plans call for 17,000 sf of digital signage displayed above three restaurants and up to four major brand retailers. Parking for residents and guests will exceed 1,700 spaces.

As expected, though, all of these amenities and this prime location comes at a cost for anyone looking to call Circa home, as rents are expected to range from $3,000 per month up to a staggering $20,000 per month.

Harley Ellis Devereaux is the project architect and HansonLA is handling interior architecture duties.

 

Rendering courtesy of Circa.

 

Rendering courtesy of Circa.

 

Rendering courtesy of Circa.

 

Rendering courtesy of Circa.

Tags

Related Stories

Wood | Oct 19, 2018

Design revealed for mass-timber residential tower in Milwaukee

The developer is confident that the city will approve construction, which is scheduled to start next year.

Mixed-Use | Oct 4, 2018

Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County

Axis/GFA Architecture and Design was the architect for the project.

Mixed-Use | Sep 25, 2018

Dexter Yard to provide Seattle with 540,000 sf of mixed-use space

SkB Architects designed the development.

Mixed-Use | Sep 14, 2018

Six-story structure combines a parking garage with street-level retail

Eskew+Dumez+Ripple designed the structure.

Reconstruction & Renovation | Aug 22, 2018

Former shopping mall becomes mixed-use urban complex in Beijing

Schmidt Hammer Lassen Architects designed the project.

Mixed-Use | Aug 13, 2018

Florida mixed-use development uses wellness as the backbone of its design

Zyscovich Architects designed the project.

Mixed-Use | Jul 17, 2018

Water Street Tampa’s developer reveals details about this project’s public spaces

This $3 billion waterfront neighborhood will also include three hotels.

Urban Planning | Jul 6, 2018

This is Studio Gang's first design project in Canada

The building’s hexagonal façade will provide passive solar heating and cooling.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021