The 72,000-sf Toronto York Recreation Centre in Ontario, which opened officially on April 23, is situated at the intersection of three neighborhoods: Mount Dennis, Keelesdale, and Rockcliffe.
The centre, which is owned by the city of Toronto and operated by its Parks, Forestry, and Recreation department, is free to the public. And since April through early July 10,000 people had signed up for its various programs. “We see this centre as a catalyst for growth,” says Duff Balmer, OAA, NSAA, MRIAC, Design Principal for Perkins +Will Canada Architects, which designed the building.
The rec centre cost 27.147 million Canadian dollars (US$21.45 million) to build. It was one of the initiatives that sprang from Toronto Mayor David Miller’s Strong Neighborhoods Task Force. It includes a 25-meter, six-lane indoor pool, double gym, fitness studio, weight room, indoor track, kitchen, five multipurpose rooms, and universal change rooms.
Lots of natural light streams into the rec centre's double gymnasium. Image: Tom Arban Photography
P+W engaged in “extensive” community outreach during the design process, which to Balmer’s surprise attracted a lot of younger people. Those sessions led to the inclusion of the track, a viewing gallery for the pool, a dance studio, and a music room.
“We also heard a lot about the need for safety,” says Balmer, which translated into streaming more natural light into the spaces. (The gym is the most obvious manifestation of this.)
The site of this 72,000-sf facility is complicated by being on the banks of a ravine for the Black Creek River. The landscape architect was Fleisher Ridout Partnership. Image: Tom Arban Photography
Prior to the rec center, this site had been underutilized. It had a raggedy baseball diamond, and its access area had devolved into a dumping ground that needed to be remediated before construction could begin.
The site is located on the west bank of a ravine along the Black Creek River, and the building needed to be positioned outside of the river’s floodplain, which limited the amount of land it had to work with.
A 25-meter, six-lane pool is one of the rec centre's features. Image: Tom Arban Photography
On the positive side, a vehicular bridge built over the river connects the rec centre to Keelesdale Park. And the facility, which is about eight miles from downtown Toronto, will be located near a train station for the new Metrolinx Eglinton Crosstown light-rail line, which is currently under construction.
The rec center was substantially completed last December and had a soft opening on February 18. The project’s hard and soft costs totaled C$33.27 million. The Building Team included Bondfield Construction Company (GC), the city’s Capital Projects unit (project manager), and Fleisher Ridout Partnership (landscape architect).
Related Stories
| Aug 15, 2016
Top 50 Sports Facility Architecture Firms
Populous, HKS, and HOK top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.
High-rise Construction | Aug 1, 2016
Rising to the occasion: Dubai shows some pictures of proposed 500-step structure
Still in the planning stages, this building would serve tourists and power climbers alike.
Sports and Recreational Facilities | Jul 31, 2016
Shanghai’s latest tourist attraction: an outside, rail-less walkway around one of its tallest skyscrapers
For less than $60, you can now get a bird’s-eye (or window-washer’s) view of the cityscape.
Sports and Recreational Facilities | Jul 20, 2016
San Diego’s waterfront redevelopment would go beyond a mere ‘project’
Its developers envision a thriving business, education, and entertainment district, highlighted by a huge observation tower and aquarium.
Sports and Recreational Facilities | Jul 20, 2016
Chicago Cubs unveil plans for premier fan club underneath box seats at Wrigley Field
As part of the baseball team’s larger stadium renovation project, the club will offer exclusive food, drinks, and seating.
Events Facilities | Jul 19, 2016
Houston architect offers novel idea for Astrodome renovation
Current plans for the Astrodome’s renovation turn the site into an indoor park and events space, but a Houston architect is questioning if that is the best use of the space
Sports and Recreational Facilities | Jul 18, 2016
Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project
The 70,000-seat stadium will be ready by the 2019 NFL season. The surrounding mixed-use development includes space for retail, hotels, and public parks.
Building Tech | Jul 14, 2016
Delegates attending political conventions shouldn’t need to ask ‘Can you hear me now?’
Each venue is equipped with DAS technology that extends the building’s wireless coverage.
Contractors | Jul 4, 2016
A new report links infrastructure investment to commercial real estate expansion
Competitiveness and economic development are at stake for cities, says Transwestern.
Sports and Recreational Facilities | Jun 9, 2016
Swimming may be returning to Melbourne’s polluted Yarra River… kind of
The addition of a pool to the Yarra may help improve people’s perception of the river and act as the impetus to an increase in support for improving its water quality.