flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A new Rec Centre in Toronto links three neighborhoods

Sports and Recreational Facilities

A new Rec Centre in Toronto links three neighborhoods

Community engagement impacts its design and programming.


By John Caulfield, Senior Editor | July 17, 2017

The Toronto York Recreation Centre serves three communities that participated in a number of design sessions with the project's Building Team. Image: Tom Arban Photography

The 72,000-sf Toronto York Recreation Centre in Ontario, which opened officially on April 23, is situated at the intersection of three neighborhoods: Mount Dennis, Keelesdale, and Rockcliffe.

The centre, which is owned by the city of Toronto and operated by its Parks, Forestry, and Recreation department, is free to the public. And since April through early July 10,000 people had signed up for its various programs. “We see this centre as a catalyst for growth,” says Duff Balmer, OAA, NSAA, MRIAC, Design Principal for Perkins +Will Canada Architects, which designed the building.

The rec centre cost 27.147 million Canadian dollars (US$21.45 million) to build. It was one of the initiatives that sprang from Toronto Mayor David Miller’s Strong Neighborhoods Task Force. It includes a 25-meter, six-lane indoor pool, double gym, fitness studio, weight room, indoor track, kitchen, five multipurpose rooms, and universal change rooms.

 

Lots of natural light streams into the rec centre's double gymnasium. Image: Tom Arban Photography

 

P+W engaged in “extensive” community outreach during the design process, which to Balmer’s surprise attracted a lot of younger people. Those sessions led to the inclusion of the track, a viewing gallery for the pool, a dance studio, and a music room.

“We also heard a lot about the need for safety,” says Balmer, which translated into streaming more natural light into the spaces. (The gym is the most obvious manifestation of this.)

 

The site of this 72,000-sf facility is complicated by being on the banks of a ravine for the Black Creek River. The landscape architect was Fleisher Ridout Partnership. Image: Tom Arban Photography

 

Prior to the rec center, this site had been underutilized. It had a raggedy baseball diamond, and its access area had devolved into a dumping ground that needed to be remediated before construction could begin.

The site is located on the west bank of a ravine along the Black Creek River, and the building needed to be positioned outside of the river’s floodplain, which limited the amount of land it had to work with.

 

A 25-meter, six-lane pool is one of the rec centre's features. Image: Tom Arban Photography

 

On the positive side, a vehicular bridge built over the river connects the rec centre to Keelesdale Park. And the facility, which is about eight miles from downtown Toronto, will be located near a train station for the new Metrolinx Eglinton Crosstown light-rail line, which is currently under construction.

The rec center was substantially completed last December and had a soft opening on February 18. The project’s hard and soft costs totaled C$33.27 million. The Building Team included Bondfield Construction Company (GC), the city’s Capital Projects unit (project manager), and Fleisher Ridout Partnership (landscape architect).

Related Stories

Sports and Recreational Facilities | Feb 19, 2024

Sports stadium developers sweeten projects with affordable housing to gain support

In recent years, sports stadium developers have been including affordable housing in their projects to win support from local governments and community activists.

Mixed-Use | Jan 26, 2024

Entertainment districts are no longer just about sports, dining, and music

Diversity of experiences is what makes entertainment districts tick these days. That’s one reason why offices continue to be included in district proposals. And in their efforts to emerge as year-round destinations, more districts are either including residential in their proposals or supporting existing districts with housing.

Sports and Recreational Facilities | Dec 15, 2023

San Antonio Spurs’ new practice facility aims to help players win championships and maintain well-being

Designed by ZGF, the Victory Capital Performance Center uses biophilic design to promote better health and wellness on and off the court.

Giants 400 | Oct 17, 2023

Top 70 Sports Facility Construction Firms for 2023

AECOM, Turner Construction, Clark Group, Mortenson head BD+C's ranking of the nation's largest sports facility contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Oct 17, 2023

Top 130 Sports Facility Architecture Firms for 2023

Populous, Gensler, HOK, and HKS head BD+C's ranking of the nation's largest sports facility architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Contractors | Sep 25, 2023

Balfour Beatty expands its operations in Tampa Bay, Fla.

Balfour Beatty is expanding its leading construction operations into the Tampa Bay area offering specialized and expert services to deliver premier projects along Florida’s Gulf Coast.

Mixed-Use | Sep 20, 2023

Tampa Bay Rays, Hines finalize deal for a stadium-anchored multiuse district in St. Petersburg, Fla.

The Tampa Bay Rays Major League Baseball team announced that it has reached an agreement with St. Petersburg and Pinellas County on a $6.5 billion, 86-acre mixed-use development that will include a new 30,000-seat ballpark and an array of office, housing, hotel, retail, and restaurant space totaling 8 million sf.

Sports and Recreational Facilities | Sep 1, 2023

New Tennessee Titans stadium conceived to maximize types of events that can be hosted

The new Tennessee Titans stadium was conceived to maximize the number and type of events that the facility can host. In addition to serving as the home of the NFL’s Titans, the facility will be a venue for numerous other sporting, entertainment, and civic events. The 1.7-million sf, 60,000-seat, fully enclosed stadium will be built on the east side of the current stadium campus. 

Adaptive Reuse | Aug 31, 2023

Small town takes over big box

GBBN associate Claire Shafer, AIA, breaks down the firm's recreational adaptive reuse project for a small Indiana town.

Giants 400 | Aug 22, 2023

Top 115 Architecture Engineering Firms for 2023

Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021