flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New plans call for hundreds of thousands of British homes to be heated by factory machines

Sustainability

New plans call for hundreds of thousands of British homes to be heated by factory machines

An expansion of ‘heat networks’ is viewed as a possible means for Britain to accomplish its goal of slashing carbon emissions by 2050.


By David Malone, Associate Editor | September 7, 2016

Pixabay Public Domain

Waste not, want not. That’s how the saying goes, and it is a saying local authorities in England and Wales are taking to heart. In an effort to reach the countries' goal of slashing carbon emissions by 2050, new government-backed plans call for a huge expansion of “heat networks” that use warmth generated by industrial machinery, geothermal energy, and subway trains to heat homes, The Telegraph reports.

A heat network is, as it sounds, a large network of insulated pipes that transports hot water or steam to “heat exchanger” units in homes in order to heat up the mains water supply. Basically, the networks make use of heat that is produced as a waste by-product of commercial or industrial processes in order to replace less efficient domestic gas boilers.

Of the 381 local authorities in England and Wales, 131 of them are now working on some sort of heat network plan.

Islington, north London is planning to use heat generated from the Northern Line of the London Underground network while other locations are exploring using geothermal heat from deep beneath the earth's surface or even recycling heat from pottery kilns from the local ceramics industry.

In 2015, an additional £320 million was set aside to help fund the construction of up to 200 projects, which would produce enough heat to supply 400,000 homes.

There are still two main hurdles that need to be overcome for these plans to work, however. The first issue is in creating a viable business model for the rollout to millions of households. Currently, it is difficult to finance a project without securing customers, but it is difficult to secure customers for something that doesn’t yet exist.

The second issue is in figuring out how to deal with “customer protection, choice, and pricing” Richard Howard, Head of Energy and Environment at Policy Exchange says in an interview with The Telegraph. “Heat networks generally lock customers in on very long term contracts, which can be 15-20 years.” A contract that long may scare away potential customers.

While heat networks seem to offer a glimmer of hope for de-carbonizing heating supplies, it remains to be seen just how viable they will actually be once implementation begins.

Related Stories

Sustainable Design and Construction | Nov 17, 2020

A digital catalog offers mass timber solutions for greener urban construction

Hybrid designs reconcile metropolitan growth and lower CO2 emissions.

Sustainability | Nov 11, 2020

Passive house design: A key to sustainable community building

Passive House is a high-performance building standard that emphasizes tightly insulated enclosures, heat recovery, and monitors airflow to reduce energy consumption.

Sustainability | Sep 30, 2020

U.S. Green Building Council, Green Business Certification Inc. expand resilience resources to support the green building industry

LEED and GBCI rating systems drive resilience-enhancing strategies to help businesses and governments mitigate climate risks.

Sustainability | Aug 13, 2020

The largest single sloped solar array in the country completes

The installation sits atop Pittsburgh’s Mill 19.

Sustainability | Aug 11, 2020

Sustainability is key for Denver Water’s modernized campus and distribution system

The utility is showcasing a new admin building and a water reuse plan that’s a first for the state.

Sponsored | Voice of the Brand | Jul 2, 2020

Solving the Building Envelope Challenge

Today, solutions for the building envelope need to meet exacting standards on two equally important fronts – long-term performance and enduring aesthetic appeal. In this article, CENTRIA demonstrates how its products meet the standard in two different scenarios – construction of a new hospital in Asheville, North Carolina, and the addition to a popular museum in Pittsburgh. 

Sustainability | May 11, 2020

Watch Bjarke Ingels discuss Mars Science City, BIG's prototype Martian city in Dubai

Ingels believes designing for Mars will help us reach sustainability goals on Earth.

Multifamily Housing | May 8, 2020

'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

Stantec and Muñoz + Albin are the project's architects.  

boombox1
boombox2
native1

More In Category

Green

Global green building alliance releases guide for $35 trillion investment to achieve net zero, meet global energy transition goals

The international alliance of UK-based Building Research Establishment (BRE), the Green Building Council of Australia (GBCA), the Singapore Green Building Council (SGBC), the U.S. Green Building Council (USGBC), and the Alliance HQE-GBC France developed the guide, Financing Transformation: A Guide to Green Building for Green Bonds and Green Loans, to strengthen global cooperation between the finance and real estate sectors.



Products and Materials

Top products from AIA 2024

This month, Building Design+Construction editors are bringing you the top products displayed at the 2024 AIA Conference on Architecture & Design. Nearly 550 building product manufacturers showcased their products—here are 17 that caught our eye.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021