flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Phase 1 Environmental Site Assessment standard debuts in 2021

Codes and Standards

New Phase 1 Environmental Site Assessment standard debuts in 2021

Will affect 250,000 commercial real estate deals a year.


By Peter Fabris, Contributing Editor | April 14, 2021

Courtesy Pixabay

A new version of ASTM E1527 standard for Phase 1 Environmental Site Assessments is expected to be completed this year.

The new standard would affect about 250,000 commercial real estate deals a year. One of the proposed changes could be interpreted to require the same level of historical research of adjoining properties as is done for the subject property. The assessment, in such a case, would require additional historical research to fill in data gaps for certain adjoining properties, which could increase the scope and cost of some reports and potentially delay transactions.

Other proposed changes add PFAS and other emerging contaminants to the list of “non-scope issues,” raising awareness of the issue that some may want to evaluate as is commonly done with asbestos and mold. The draft new standard aims to call more attention to significant data gaps, a substantial piece of information that wasn’t feasible to obtain given time or budget constraints.

Data gaps would be assessed as to whether they materially affect the environmental professional’s ability to identify Recognized Environmental Conditions (RECs). The ASTM committee will continue to discuss, refine, and vote on proposed changes and has a goal of releasing the new standard by the end of the year.

Related Stories

Codes and Standards | Jul 22, 2020

Mobile app calculates sound transmission for wood-framed assemblies

American Wood Council tool for floor-ceiling assemblies.

Codes and Standards | Jul 22, 2020

Architecture billings remain in negative territory, begin to stabilize

Fewer architecture firms report declining billings this month.

Codes and Standards | Jul 20, 2020

N.Y. construction firm to pay $1.5 million to settle sexual harassment claim

Managers said to demand sex for pay and OT opportunities.

Codes and Standards | Jul 16, 2020

Tips to make optimal use of salvaged materials

Integrated teams, staging warehouse, and looking early and often, among recommendations.

Codes and Standards | Jul 15, 2020

Georgia gives the go-ahead for tall mass timber construction

Standards review scheduled to be completed by July 2021.

Codes and Standards | Jul 15, 2020

Softwood-lumber duties boost expenses amid COVID-19 outbreak

Little hope this year for resolution of trade dispute with Canada.

Codes and Standards | Jul 14, 2020

Metal Construction Assn. releases three EPD updates

Pertain to Metal Composite Materials, Insulated Metal Panels, and Roll Formed Aluminum and Steel Cladding.

Codes and Standards | Jul 13, 2020

5 must reads for the AEC industry today: July 13, 2020

4 technologies for improving building sanitation and tech's ever-evolving impact on the multifamily space.

Codes and Standards | Jul 9, 2020

Funding opportunity for field validation of high-impact building technologies

Dept. of Energy program targets dynamic interactions with electric grid.

Codes and Standards | Jul 8, 2020

Standards for reducing risk of COVID-19 in senior living communities

AIA releases strategies and illustrations for the sector.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021