flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Phase 1 Environmental Site Assessment standard debuts in 2021

Codes and Standards

New Phase 1 Environmental Site Assessment standard debuts in 2021

Will affect 250,000 commercial real estate deals a year.


By Peter Fabris, Contributing Editor | April 14, 2021

Courtesy Pixabay

A new version of ASTM E1527 standard for Phase 1 Environmental Site Assessments is expected to be completed this year.

The new standard would affect about 250,000 commercial real estate deals a year. One of the proposed changes could be interpreted to require the same level of historical research of adjoining properties as is done for the subject property. The assessment, in such a case, would require additional historical research to fill in data gaps for certain adjoining properties, which could increase the scope and cost of some reports and potentially delay transactions.

Other proposed changes add PFAS and other emerging contaminants to the list of “non-scope issues,” raising awareness of the issue that some may want to evaluate as is commonly done with asbestos and mold. The draft new standard aims to call more attention to significant data gaps, a substantial piece of information that wasn’t feasible to obtain given time or budget constraints.

Data gaps would be assessed as to whether they materially affect the environmental professional’s ability to identify Recognized Environmental Conditions (RECs). The ASTM committee will continue to discuss, refine, and vote on proposed changes and has a goal of releasing the new standard by the end of the year.

Related Stories

Codes and Standards | Jan 11, 2017

OSHA prompts more proactive approach to construction site safety

Remote operated camera systems are being used to mitigate risk in real time.

Codes and Standards | Jan 10, 2017

Plunging solar power costs making PVs more compelling for owners, developers

Technical and manufacturing advances are driving down prices.

Codes and Standards | Jan 9, 2017

Boston’s plans for new development at odds with flood projections

One plan calls for building in areas predicted to be flooded during high tides as sea levels rise.

Codes and Standards | Jan 9, 2017

New LEED for Cities, LEED for Communities pilot certifications unveiled

Requires tracking of performance data and progress toward goals. 

Codes and Standards | Jan 9, 2017

China claims top ranking outside of U.S. for total LEED-certified space

Canada, India, Brazil, and Korea round out top 5.

Codes and Standards | Jan 6, 2017

OSHA prompts more proactive approach to construction site safety

Remote operated camera systems are being used to mitigate risk in real time.

Codes and Standards | Jan 5, 2017

2018 building energy code upholds efficiency gains

Efforts to scale back efficiency requirements largely defeated.

Codes and Standards | Jan 4, 2017

Low-income housing doesn’t lower neighborhood housing values

A Trulia study contradicts longstanding fears.

Codes and Standards | Jan 3, 2017

Intelligent transportation systems have implications for designers, construction firms

Sensors and Internet of Things devices will have to be embedded in infrastructure.

Codes and Standards | Dec 15, 2016

OSHA releases safety recommendation guide for construction industry

It is said to be most helpful to small and mid-sized contractors.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021