The Xiqu Center, a performance venue and the new home for Chinese opera, recently completed in Hong Kong’s new multi-billion dollar West Kowloon Cultural District (WKCD). The Xiqu Center is the first performance venue in WKCD and also the first venue in the world designed for classical Chinese Opera.
The main theater is suspended 90 feet in the air to open up the entire ground level as public space. “It results in a new paradigm of an open, shaded, protective, and generous public plaza inHong Kong’s legendary dense urban fabric,” says John Wong, FASLA, FAAR, Design Principal and Chairman, SWA, in a release.
Xiqu’s ground floor serves as an urban stage designed to facilitate movement, provide a gathering space, and enhance the visitor experience. The landscape and architecture blend together to create a space that feels both indoors and outdoors and features groupings of trees at each entry and a naturally ventilated open-air interior courtyard. Another two outdoor gardens flank the main performance hall on the fourth floor.
See Also: SWA designs people-centric landscape and public realm for Chase Center
The exterior of the building is curved three dimensionally with arched openings strategically located at all corners. A lifted facade provides three main entry areas with access to the ground level. Each entry level is determined by the surrounding site conditions. A public amphitheater with an outdoor performance area is also included.
Revery Architecture and SWA collaborated on the project’s design.
Related Stories
| Oct 5, 2012
2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.
Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.
| Oct 4, 2012
2012 Reconstruction Awards Silver Winner: Allen Theatre at PlayhouseSquare, Cleveland, Ohio
The $30 million project resulted in three new theatres in the existing 81,500-sf space and a 44,000-sf contiguous addition: the Allen Theatre, the Second Stage, and the Helen Rosenfeld Lewis Bialosky Lab Theatre.
| Jun 22, 2012
Revitalization Efforts Advance in Hackensack, N.J.
Work progresses on Cultural and Performing Arts Center and Atlantic Street Park
| Jun 8, 2012
Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex
Casaccio Yu Architects designed the 11,300-sf fitness and social complex.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 19, 2012
KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed
First of eight buildings highlights unique amenities.