The latest Passive House Institute U.S. (PHIUS) standard, expected to be released early next year, contains a prescriptive path option that could reduce the cost of certification.
Passive House 2021+ is expected to include the ability to achieve certification without a requirement for a Passive House consultant and the attendant modeling that goes with it. The Prescriptive Design Review checklist is four pages plus footnotes. It is similar to ENERGY STAR rater checklists.
The new Prescriptive Path provides an online calculator that requires a few entries to determine minimum R-values and maximum window U factor. These provisions include a window U factor maximum of .25, R-31 for cantilevered floors, R-61 for roof or ceiling insulation, and R-20 for slabs and floors over unconditioned space. Alternatively, one can provide a calculation that meets the same overall UA as the prescriptive requirements. This allows for tradeoffs.
Related Stories
Market Data | Sep 22, 2020
6 must reads for the AEC industry today: September 22, 2020
Construction employment declined in 39 states and no ease of lumber prices in sight.
Market Data | Sep 21, 2020
Washington is the US state with the most value of construction projects underway, says GlobalData
Of the top 10 largest projects in the Washington state, nine were in the execution stage as of August 2020.
Market Data | Sep 21, 2020
Construction employment declined in 39 states between August 2019 and 2020
31 states and DC added jobs between July and August.
Market Data | Sep 21, 2020
6 must reads for the AEC industry today: September 21, 2020
Four projects receive 202 AIA/ALA Library Building Award and Port San Antonio's new Innovation Center.
Market Data | Sep 18, 2020
Follow up survey of U.S. code officials demonstrates importance of continued investment in virtual capabilities
Existing needs highlight why supporting building and fire prevention departments at the federal, state, and local levels is critical.
Market Data | Sep 18, 2020
6 must reads for the AEC industry today: September 18, 2020
Sagrada Familia completion date pushed back and energy code appeals could hamper efficiency progress.
Market Data | Sep 17, 2020
6 must reads for the AEC industry today: September 17, 2020
Foster + Partners-designed hospital begins construction in Cairo and heat pumps are the future for hot water.
Market Data | Sep 16, 2020
6 must reads for the AEC industry today: September 16, 2020
REI sells unused HQ building and Adjaye Associates will design The Africa Institute.
Market Data | Sep 15, 2020
7 must reads for the AEC industry today: September 15, 2020
Energy efficiency considerations for operating buildings during a pandemic and is there really a glass box paradox?
Market Data | Sep 14, 2020
6 must reads for the AEC industry today: September 14, 2020
63% of New York's restaurants could be gone by 2021 and new weapons in the apartment amenities arms race.