Economic conditions have caused a shift in opportunities for office builders as projects become less about new construction and more about renovating space. This growing trend is apparent as KMA Architecture & Engineering (KMA) announced that construction is underway for Sunroad Enterprises on behalf of tenant, Westcore Properties located at the Sunroad Corporate Center in University Towne Center (UTC).
KMA was retained by Sunroad Enterprises to reconfigure 16,000 sf of office space on the third floor of a four-story building for Westcore Properties.
KMA and interior design partner I.D. Studios Interiors are transforming a traditional office space into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.
Renovations are expected to be complete in April 2012.
The KMA team includes Rich Guerena, B. Moon Hajjar and Jay Janda. Electrical engineering services are provided by Hughes Design Services; plumbing engineering services are provided by LAB Drafting and Design; mechanical engineering services are provided by National Air and Energy; interior design consultation is being provided by I.D. Studios Interiors; and general contracting services are provided by Bycor Construction and Sunroad Enterprises. BD+C
Related Stories
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.