Economic conditions have caused a shift in opportunities for office builders as projects become less about new construction and more about renovating space. This growing trend is apparent as KMA Architecture & Engineering (KMA) announced that construction is underway for Sunroad Enterprises on behalf of tenant, Westcore Properties located at the Sunroad Corporate Center in University Towne Center (UTC).
KMA was retained by Sunroad Enterprises to reconfigure 16,000 sf of office space on the third floor of a four-story building for Westcore Properties.
KMA and interior design partner I.D. Studios Interiors are transforming a traditional office space into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.
Renovations are expected to be complete in April 2012.
The KMA team includes Rich Guerena, B. Moon Hajjar and Jay Janda. Electrical engineering services are provided by Hughes Design Services; plumbing engineering services are provided by LAB Drafting and Design; mechanical engineering services are provided by National Air and Energy; interior design consultation is being provided by I.D. Studios Interiors; and general contracting services are provided by Bycor Construction and Sunroad Enterprises. BD+C
Related Stories
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.