Woodward Design+Build announced the opening of its new, multi million-dollar headquarters located in New Orleans. Entirely designed and built by the Woodward team, the 45,000 square foot facility showcases Woodward’s fully integrated design and build process as well as the latest advances and techniques in the field.
Woodward crafted its headquarters with a goal of attaining LEED Silver Certification. A total of 235 solar panels sit atop the building’s roof making it the largest solar energy system in New Orleans.
The panels help supply 20% of the building’s energy needs by sending surplus energy back into the grid. Another energy efficient feature is the highly reflective roof coating, which minimizes the full impact of the midday sun. Even the building’s orientation to the street was designed relative to the sun, optimizing northern day lighting to provide plenty of natural light in workspaces. BD+C
Related Stories
| Jul 19, 2012
Contractors finally ‘moving off the bottom’
C and CM Agent + PM Giants 300 Firms also taking steps to improve project efficiency.
| Jul 19, 2012
The best states for a construction job
The top anticipated engineering and skilled labor shortages according to a survey of 2,223 construction industry professionals.
| Jul 19, 2012
Suffolk Construction launches subcontractor development series
Professional certificate program to provide core construction management skills to disadvantaged, minority, and women business enterprises.
| Jul 19, 2012
Construction begins on military centers to treat TBI and PTS
First two of several centers to be built in Fort Belvoir, Va. and Camp Lejeune, N.C.
| Jul 18, 2012
U.S. engineering firms set sail for foreign ports
Other E/EA Giants 300 firms are just dipping their toes into foreign waters, still looking for international business but choosing not to establish additional offices.
| Jul 18, 2012
Architecture giants spreading their wings
A/AE Giants 300 rankings reveal firms branching out globally, merging, adding services.
| Jul 18, 2012
Green expert Kats joins GreenWizard as an advisor
Kats' role is to help further expand GreenWizard’s impact in the sustainable construction industry.
| Jul 18, 2012
Construction employment stagnates in June
Lack of hiring in construction combined with job growth elsewhere threatens to create skilled-labor gap once contractors are ready to hire again.
| Jul 18, 2012
Legat & Kingscott relocates architecture/interior design office
Move enables the architecture/interior design firm to better serve its expanding clientele.
| Jul 18, 2012
Alcoa appoints Hunter Architectural Manager
Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.