3XN Architects was recently awarded the contract to design a new multipurpose arena on the site of the former Olympic cycling track stadium in Munich Olympic Park. The stadium will have a seating capacity of 11,500 and will be the home of the Munich Red Bulls, an ice hockey team, and FC Bayern Munich, a basketball team. An additional three canopied ice rinks built next to the arena will be used as training facilities and for recreational use.
The stadium will be an oval structure that has a vertical facade structure and is topped with a green roof. The facade will be dominated by vertical lamellas that swing upwards over the glass-paneled entrances. The training areas will be partially underground and are modelled to form a green hill meant to mimic the surrounding topography.
See Also: New ice-skating facility in southern California built to endure seismic events
The arena’s gross floor area will be 673,000 sf and will include fan shops, offices and conference facilities, 11 VIP boxes with 156 seats, approximately 1,000 business seats, and an underground parking garage with 220 spaces (an additional 4,000 parking spaces are available at ‘Parkharfe Olympiapark’).
Both the hockey team and the basketball team will be able to play 40 games a year at the stadium. There will be additional capacity for up to 40 other games and sports-related events each year
The inauguration of the new arena is currently planned for summer 2021.
Related Stories
| Oct 12, 2014
AIA 2030 commitment: Five years on, are we any closer to net-zero?
This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030.
| Sep 24, 2014
Architecture billings see continued strength, led by institutional sector
On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 17, 2014
Atlanta Braves break ground on mixed-use ballpark development
SunTrust Park will be constructed by American Builders 2017, a joint venture between Brasfield & Gorrie, Mortenson Construction, Barton Malow Company, and New South Construction.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.
| Aug 29, 2014
The new College Football Hall of Fame opens in Atlanta
Adjacent to the Georgia World Congress Center and Centennial Olympic Park, the three-story, 94,250-sf attraction is designed to celebrate the traditions of college football.
| Aug 27, 2014
Ranked: Top sports facility sector AEC firms [2014 Giants 300 Report]
Populous, AECOM, and Turner head BD+C's rankings of the nation's largest sports facility design and construction firms, as reported in the 2014 Giants 300 Report.