flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Mixed-Use

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

The 23-story building provides 254 new residential units, along with ground-floor retail.


By Peter Fabris, Contributing Editor | October 7, 2024
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Verde, intended to be Mission Rock’s central social hub, takes its name from distinctive, green-colored glazed ceramic cladding that allows for variations in color and depth at multiple scales. The 23-story building provides 254 new residential units—59 of which are designated for middle-income households at below-market rents.

The building features a ground-level café, shops, and micro-activations that include a water bottle refill station and a living wall. Resident amenities include a fitness center, lounges, a game room, a golf simulator, and a shared outdoor dining space equipped with a barbecue and firepit. A sky deck on the tower’s roof provides another space for residents to take in views of Oracle Park, San Francisco Bay, and the city’s skyline.

“We wanted to create spaces where residents could connect with each other while feeling embraced by the natural beauty of San Francisco,” said Studio Gang’s founding partner Jeanne Gang. “The tower’s floorplates are carved back at the corners to create outdoor terraces that are unique across each floor. These terraces are oriented to maximize sunlight and protect from the wind while providing residents views of the city and San Francisco Bay. From the street, the alternating carved terraces give the building a rhythmic play of light.”

Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 

Located near major public transit nodes, the site offers access to the waterfront Bay Trail and over 250 bicycle parking spaces to encourage alternative and active modes of transportation. The development is elevated five feet above sea level to ensure protection against future sea level rise and storm surges. The building reuses and recycles greywater for irrigation and non-potable needs, as well as sources hot and cold water from a District Energy Plant. Planted with regionally appropriate flora, the sky deck attracts birds, butterflies, and other pollinators to enhance urban biodiversity. The building is targeting LEED Gold certification.

Verde is part of Mission Rock redevelopment led by Mission Rock Partners, a public-private partnership between Tishman Speyer, the San Francisco Giants, and the Port of San Francisco. The new neighborhood offers unprecedented public access to San Francisco Bay and introduces more than 500 new homes and 600,000 sf of retail and office space to San Francisco’s Central Waterfront.

The first phase of Mission Rock features China Basin Park, a new 5-acre public park designed by SCAPE that opened in April 2024, and four new buildings. In addition to Verde, phase one’s buildings include The Canyon, a residential building designed by MVRDV that opened in June 2023, the new home of Visa’s Market Support Center designed by Henning Larsen that opened in June 2024, and a new commercial building designed by WorkAC.

On the project team:
Owner and/or developer: Mission Rock Partners
Design architect: Studio Gang
Architect of record: Studio Gang
Mechanical Engineer: Critchfield Mechanical Inc.
Electrical Engineer: PAE
Plumbing Engineer: SJE Engineers
Structural engineer: Magnusson Klemencic Associates
General contractor: Webcor Builders

Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, courtesy Studio Gang
Courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, courtesy Studio Gang
Courtesy Studio Gang 

 

Related Stories

Multifamily Housing | Feb 10, 2023

Dallas to get a 19-story, 351-unit residential high-rise

In Dallas, work has begun on a new multifamily high-rise called The Oliver. The 19-story, 351-unit apartment building will be located within The Central, a 27-acre mixed-use development near the Knox/Henderson neighborhood north of downtown Dallas. 

Mixed-Use | Dec 7, 2022

Bjarke Ingels’ first design project in South America is poised to open next year in Ecuador

In 2013, Quito, Ecuador’s capital, opened its new airport, which had been relocated from the metro’s center to an agricultural site 12 miles northeast of the city. Since then, Quito’s skyline has been reshaped by new, vertical structures that include the 24-story mixed-use EPIQ Residences, designed in the shape of a quarter circle by Bjarke Ingels Group (BIG).

High-rise Construction | Dec 7, 2022

SOM reveals its design for Singapore’s tallest skyscraper

Skidmore, Owings & Merrill (SOM) has revealed its design for 8 Shenton Way—a mixed-use tower that will stand 63 stories and 305 meters (1,000 feet) high, becoming Singapore’s tallest skyscraper. The design team also plans to make the building one of Asia’s most sustainable skyscrapers. The tower incorporates post-pandemic design features.

Office Buildings | Dec 6, 2022

‘Chicago’s healthiest office tower’ achieves LEED Gold, WELL Platinum, and WiredScore Platinum

Goettsch Partners (GP) recently completed 320 South Canal, billed as “Chicago’s healthiest office tower,” according to the architecture firm. Located across the street from Chicago Union Station and close to major expressways, the 51-story tower totals 1,740,000 sf. It includes a conference center, fitness center, restaurant, to-go market, branch bank, and a cocktail lounge in an adjacent structure, as well as parking for 324 cars/electric vehicles and 114 bicycles.

Mixed-Use | Dec 6, 2022

Houston developer plans to convert Kevin Roche-designed ConocoPhillips HQ to mixed-use destination

Houston-based Midway, a real estate investment, development, and management firm, plans to redevelop the former ConocoPhillips corporate headquarters site into a mixed-use destination called Watermark District at Woodcreek.

Data Centers | Nov 28, 2022

Data centers are a hot market—don't waste the heat!

SmithGroup's Brian Rener shares a few ways to integrate data centers in mixed-use sites, utilizing waste heat to optimize the energy demands of the buildings.

Mixed-Use | Oct 20, 2022

ROI on resilient multifamily construction can be as high as 72%

A new study that measured the economic value of using FORTIFIED Multifamily, a voluntary beyond-code construction and re-roofing method developed by the Insurance Institute for Business & Home Safety (IBHS), found the return can be as high as 72%.

Mixed-Use | Oct 18, 2022

Mixed-use San Diego tower inspired by coastal experience and luxury travel

The new 525 Olive mixed use San Diego tower was inspired by the coastal experience and luxury travel.

Multifamily Housing | Oct 7, 2022

Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes

The newly revealed design for 633 SE 3rd Ave., a 47-story, mixed-use tower in Ft. Lauderdale, features a sequence of stepped rounded volumes that ease the massing of the tower as it rises.

Sports and Recreational Facilities | Sep 8, 2022

Chicago Bears unveil preliminary master plan for suburban stadium district

As the 2022 NFL season kicks off, the league’s original franchise is fortifying plans to leave its landmark lakefront stadium for a multi-billion-dollar mixed-use stadium district in northwest suburban Arlington Heights.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021