Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.
Verde, intended to be Mission Rock’s central social hub, takes its name from distinctive, green-colored glazed ceramic cladding that allows for variations in color and depth at multiple scales. The 23-story building provides 254 new residential units—59 of which are designated for middle-income households at below-market rents.
The building features a ground-level café, shops, and micro-activations that include a water bottle refill station and a living wall. Resident amenities include a fitness center, lounges, a game room, a golf simulator, and a shared outdoor dining space equipped with a barbecue and firepit. A sky deck on the tower’s roof provides another space for residents to take in views of Oracle Park, San Francisco Bay, and the city’s skyline.
“We wanted to create spaces where residents could connect with each other while feeling embraced by the natural beauty of San Francisco,” said Studio Gang’s founding partner Jeanne Gang. “The tower’s floorplates are carved back at the corners to create outdoor terraces that are unique across each floor. These terraces are oriented to maximize sunlight and protect from the wind while providing residents views of the city and San Francisco Bay. From the street, the alternating carved terraces give the building a rhythmic play of light.”
Located near major public transit nodes, the site offers access to the waterfront Bay Trail and over 250 bicycle parking spaces to encourage alternative and active modes of transportation. The development is elevated five feet above sea level to ensure protection against future sea level rise and storm surges. The building reuses and recycles greywater for irrigation and non-potable needs, as well as sources hot and cold water from a District Energy Plant. Planted with regionally appropriate flora, the sky deck attracts birds, butterflies, and other pollinators to enhance urban biodiversity. The building is targeting LEED Gold certification.
Verde is part of Mission Rock redevelopment led by Mission Rock Partners, a public-private partnership between Tishman Speyer, the San Francisco Giants, and the Port of San Francisco. The new neighborhood offers unprecedented public access to San Francisco Bay and introduces more than 500 new homes and 600,000 sf of retail and office space to San Francisco’s Central Waterfront.
The first phase of Mission Rock features China Basin Park, a new 5-acre public park designed by SCAPE that opened in April 2024, and four new buildings. In addition to Verde, phase one’s buildings include The Canyon, a residential building designed by MVRDV that opened in June 2023, the new home of Visa’s Market Support Center designed by Henning Larsen that opened in June 2024, and a new commercial building designed by WorkAC.
On the project team:
Owner and/or developer: Mission Rock Partners
Design architect: Studio Gang
Architect of record: Studio Gang
Mechanical Engineer: Critchfield Mechanical Inc.
Electrical Engineer: PAE
Plumbing Engineer: SJE Engineers
Structural engineer: Magnusson Klemencic Associates
General contractor: Webcor Builders
Related Stories
Mixed-Use | Nov 5, 2018
44-acre mixed-use project completes in Northridge, Calif.
Ware Malcomb designed the project.
Mixed-Use | Oct 25, 2018
Philadelphia’s uCity Square kicks off major expansion drive
This innovation center has several office, lab, and residential buildings in the works.
Wood | Oct 19, 2018
Design revealed for mass-timber residential tower in Milwaukee
The developer is confident that the city will approve construction, which is scheduled to start next year.
Mixed-Use | Oct 15, 2018
35-story mixed-use tower will be tallest residential building in Long Beach
Studio One Eleven designed the tower.
Mixed-Use | Oct 5, 2018
Newark’s first luxury residential tower in nearly 60 years officially opens
BLT Architects designed the project.
Mixed-Use | Oct 4, 2018
Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County
Axis/GFA Architecture and Design was the architect for the project.
Mixed-Use | Sep 25, 2018
Dexter Yard to provide Seattle with 540,000 sf of mixed-use space
SkB Architects designed the development.
Mixed-Use | Sep 14, 2018
Six-story structure combines a parking garage with street-level retail
Eskew+Dumez+Ripple designed the structure.
Reconstruction & Renovation | Aug 22, 2018
Former shopping mall becomes mixed-use urban complex in Beijing
Schmidt Hammer Lassen Architects designed the project.
Mixed-Use | Aug 13, 2018
Florida mixed-use development uses wellness as the backbone of its design
Zyscovich Architects designed the project.