flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New mixed-use rental community breaks ground in Chicago’s Bronzeville neighborhood

Mixed-Use

New mixed-use rental community breaks ground in Chicago’s Bronzeville neighborhood

The building marks the latest phase of the Oakwood Shores revitalization plan.


By David Malone, Associate Editor | April 7, 2021
508 Pershing at Oakwood Shores

Courtesy NIA Architects

508 Pershing at Oakwood Shores, a 53-unit mixed-used, mixed-income rental community in Chicago’s Bronzeville neighborhood, has announced the start of construction.

The four-story building, designed by Nia Architects in collaboration with Antunovich Associates, will be clad in red brick, fiber cement, and metal panel facade. The building structure will consist of a traditional steel and precast podium for the ground level, with three stories of cold-formed panelized steel stud bearing walls and floor joists. An adjacent surface lot will provide 42 parking spaces for building residents and retail customers. 

508 Pershing will feature 50 one-bedroom and three two-bedroom units, 7,000-sf of amenity space, 3,500-sf of street-level retail, and management offices. Thirty-six of the project’s 53 units will be Low Income Housing Tax Credit units for households earning up to 80% of the Area Median Income. The remaining 17 units will be market-rate.

Apartment units will feature in-unit laundry, a dishwasher, plank flooring, and extra storage. Amenities such as a resident lounge, meeting rooms, a fitness center, a top-floor lounge, bike storage, and a dog wash will also be included.

The project is slated for completion in February 2022.

Tags

Related Stories

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

| Aug 11, 2010

New website highlights government tax incentives for large commercial buildings

Energy Retrofit Group (ERG), the subsidiary of 40-year-old, award-winning Adache Group Architects, Inc., has announced the creation of their new energy conservation web site: www.energy-rg.com.

| Aug 11, 2010

Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report

A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

The Joule Hotel
Dallas, Texas

The Joule Hotel in Dallas, designed by local firm Coburn & Smith, was constructed in 1927 as the Dallas National Bank Building. Originally one of the finest examples of gothic revival architecture in Texas, it had had most of its gothic elements removed over the years after being converted into an office building and later abandoned. What was left had fallen into disrepair.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021