flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New manual of IT connectivity guidelines for commercial developments, redevelopments released

Codes and Standards

New manual of IT connectivity guidelines for commercial developments, redevelopments released

Mobile capacity planning, conduit points of entry, and electrical resiliency are covered.


By Peter Fabris, Contributing Editor | March 23, 2017

Pixabay Public Domain

“The Wired Certification Guidelines for Commercial Developments and Redevelopments,” reportedly the only manual of its kind, was released this month.

Published by WiredScore, the guide covers how to optimally design for mobile capacity planning, conduit points of entry, electrical resiliency, and flexibility to adopt new building technologies. Designed to be used by architects, engineers, and developers during design and construction phases, the document outlines Wired Certification criteria and best practices to meet the technology needs and expectations of future tenants.

WiredScore developed criteria based on evaluation of over 900 commercial office buildings across the United States and United Kingdom, while also referencing best practices developed by experts in real estate, technology, and telecommunications.

The standards can significantly simplify design and could eliminate the need to retrofit buildings to meet new technological demands such as smart building technology, Arie Barendrecht, founder and CEO of WiredScore, told GlobeSt. The manual is available for free download at: http://blog.wiredscore.com/connectivity-guidelines-for-developers-engineers-and-architects.

Related Stories

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021